Calculation of Movable Die Carrier and Determination of Pre-camber of Bridge of High-speed Railway |
WU Shang-de |
The Engineering Supervision Co. Ltd, China Railway First Survey and Design Institute Group Ltd, Xi'an, Shanxi 730000, China |
|
|
Abstract Research purposes: The bridges in the special sections of the Shenyang-Dandong Passenger Dedicated Line needed to be built by using the bridging machine with movable die carrier because of the natural environment conditions. The calculation was made to verify the design and manufacturing qualities of the MZ900S type Bridging machine with upstriker movable die carrier, know the actual deflection and stiffness of the bridging machine under the various working states during construction of cast-in-situ box girder and determine the reasonable pre-camber according to the y=0.1213x2-30.1 for the purpose of ensuring the bridging machine in the good working state in service.
Research conclusions: (1) The calculation and heaped loading test showed the strength,stiffness, manufacturing quality and assembly quality of the movable die carrier met the design requirements and the pre-camber was reasonable according to the y=0.1213x2-30.1. (2) The movable die carrier had the features of the clear loading on the structure, good adaptability, perfect functions and high mechanization. (3) The movable die carrier met the construction requirements for the 24 m box girder, the curve bridge, the bidirectional 32m box girder with assembly of integrated 32 m bridge opening.
|
Received: 02 October 2012
|
|
|
|
|
[1] TB 10213,铁路架桥机架梁规程[S]. TB 10213,Railway Bridging Machine for Beam [S].
[2] 铁建设[2010]241号,铁路混凝土工程施工技术指南[S]. Railway Construction [2010] No.241,Technical Guide for Railway Concrete Engineering Construction [S].
[3] GB 50017—2003,钢结构设计规范[S] GB 50017—2003, Code for Design of Steel Structures [S].
[4]铁建[2005]160号,客运专线铁路桥涵工程施工质量验收暂行标准[S]. Railway Construction [2005] No.160, Passenger Dedicated Railway Bridge and Culvert Construction Quality Acceptance Standard of Interim [S].
[5] TZ 213—2005,客运专线铁路桥涵工程施工技术指南 [S]. TZ 213—2005, Passenger Dedicated Railway Bridge and Culvert Construction Technology for [S].
[6] TB 10203—2002,铁路桥涵施工规范[S]. TB 10203—2002, Standard of Railway Bridge and Culvert Construction for [S].
[7]俎保峰.客运专线铁路同心圆设计的探讨[J].铁道工程学报,2011(12): 21-24. Zu Baofeng. Passenger Dedicated Railway Concentric Design [J]. Journal of Railway Engineering Society, 2011(12): 21-24.
|
|
|
|