Key Technology and Applicable Method of CYP 500 Cluster Tie Type Long Rail Track - laying Machine Unit |
CHEN Meng-qiang,LI Shi-long |
Xinyun Engineering Co. Ltd of China Railway Erju Co. Ltd, Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes : Aiming at the problems that the traditional track laying machine with single tie continuous process needs the high cost, has the high failure rate and the track tie is subjected to damage due to impact, a new CYP 500 cluster tie type long rail track - laying machine unit is developed and manufactured in China with the self intellectual property right ,and as the core technology,the operation mode of 11 arranging the sleeper in cluster and laying the track in step" is adopted to this machine unit, with the features of the excellent performance, simple operating procedure,convenient maintenance and use and low cost. This machine unit can meet the requirements of laying ballast and ballastless tracks with 500 m long rail.
Research conclusions: (1) This track - laying machine unit integrates the long - rail track laying and the tie arranging, and is mainly composed of the long rail tractor,the host and auxiliary machines,tie carrying car, rail /tie transportation train, power system, hydraulic system, electric control system and brake system. (2) The operation mode of the host machine is designed as the " arranging the tie in cluster and laying the track in step" by using the innovative mechanism of the laying the tie evenly and sleeper arranging machine, and by using this method, the problems of high failure rate and the tie damage caused by the impact can be solved and the costs of the machine manufacture, operation and maintenance can be much cut. (3) The modularization design and manufacture are adopted to this machine unit,resulting in convenient and flexible assembly, disassembly and transferring to other site. (4) This machine machine is made in Chins with adopting the existing mature technology for long rail track laying, computer control technology and the mechatronics technology, so that the convenient use and maintenance can be achieved. (5) This research results is available for laying the ballast and ballastless tracks with the 500 m long rail or below.
|
Received: 16 April 2013
|
|
|
|
|
[1]袁广龙,耿锦,贾炳义,等.CPG 500型长轨条铺轨机组研制及施工工艺[ J].铁道工程学报,2004 (S) :101 -104. Yuan Guanglong, Geng Jin, Jia Bingyi, etc.
Manufacture of CPG 500 Long Rail Laying Machine and its Construction Technique [J] . Journal of Railway Engineering Society,2004 (S) :101 -104.
[2]李向辉.应用CPG 500型长轨条铺轨铺设无缝线路施工 技术[J].中国新技术新产品,2010 (6) :136.
Li Xianghui. Construction Technology for Laying Seamless Line Long Rail Laying Application of Type CPG 500 [J] . China New Technologies and Products, 2010(6) :136.
[3]薛学勇.DPG 500型长轨条铺轨机组组成及关键机构 [J].建设机械技术与管理,2010 (9) :91 -95.
Xue Xueyong. Composition and Key Structure of DPG 500 Long Rail Track Layng Machine [ J ]. Construction Machinery Technology & Management, 2010 (9) :91 -95.
[4]陈浩.高速铁路跨区间无缝线路铺轨机组研制商榷[J]. 铁道标准设计,2003 (6) :32 -34.
Chen Hao. Discussions about Research and Development of Track - laying Machine Unit for Continuously Welded Cross Sectional Railway Line [J]. Railway Standard Design,2003 (6) :32 -34.
[5]陈灵.高速铁路无缝线路铺轨机组的国内外发展概况 [J].建筑机械化,2005 (8) :10 - 13.
Chen Ling. Development Survey of Seamless Line Paver Set in High - speed Railway at Home and Abroad [J]. Constrcution Mechanization, 2005 (8) :10 -13.
[6]TB 10754—2010,高速铁路轨道工程施工质量验收标准[S].
TB 10754—2010,Standard for Constructional Quality Acceptance of High - speed Railway Track Engineering[S].
[7]铁建设[2010] 241号,高速铁路轨道工程施工技术指南 [S].
Railway Construction [2010] No. 241, Technical Guide for Construction of High - speed Railway Track Engineering [S].
|
|
|
|