Control Technology for Water and Mud Bursting of Railway Tunnel under Unfavorable Geological Conditions and Its Engineering Application |
ZHANG Min-qing1, PENG Feng2, ZOU Ming-bo2, XIE Xiao-fei2 |
1.The Engineering Management Center of MOR, Beijing 100844, China; 2.Beijing Zhongtie Railway Ruiwei Foundation Engineering Co. Ltd, Beijing 100055, China |
|
|
Abstract Research purposes: The water and mud bursting is one of the common geological disasters in tunnel construction. In the control process of the water and mud bursting, the professionalization management and construction are crucial to the control effect. If the dredging is conducted hastily after the water and mud bursting, the secondary disasters are easy to happen, result in appearance of the bigger water and mud bursting. At the same time, the reliabilities of the mechanized level and the control plan for the water and mud bursting have a large impact on the treatment effect: Therefore, it is necessary to do the research on the professionalization management, safe dredging and blocking, mechanical matching, control plan for the water and mud bursting and its implement to form a set of the control technology used for the water and mud bursting.
Research conclusions: (1)Grouting is an effective method for control of the water and mud bursting of railway tunnel, and the principle of the “grouting reinforcement along with drainage and dropping pressure" should be followed. (2)In order to obtain safe, efficient and economic control effects, a comprehensive control means of the grouting improvement, reinforced anchorage and large pipe roof construction should be adopted with informatization grouting technology and professionalization management.(3)This research results can be applied in control of the water and mud bursting disaster.
|
Received: 01 February 2013
|
|
|
|
|
[1]张民庆, 彭峰.地下工程注浆技术[M].北京:地质出版社,2008.
Zhang Minqing, Peng Feng. Grouting Technology Underground Works[M]. Beijing: Geological Publishing House, 2008.
[2]张民庆, 张梅.高压富水断层外堵内固注浆法设计新理念与工程实践[J].中国工程科学,2009(12):26-34.
Zhang Minqing, Zhang Mei. Design New Ideas and Engineering Practice of High-Pressure Water-Rich Fault "Outside Block and Inside Strenghthen Grouting"[J]. Engineering Sciences, 2009 (12):26-34.
[3]张民庆, 黄鸿健.齐岳山隧道高压裂隙水注浆堵水技术[J].铁道工程学报,2010(1):68-72.
Zhang Minqing, Huang Hongjian. Technology for Blocking Water by Grouting for High-Pressure Cranny Water of Qiyueshan Tunnel[J]. Journal of Railway Engineering Society, 2010(1):68-72.
[4]张梅, 张民庆, 孙国庆.宜万铁路野三关隧道高压富水充填溶腔溃口处理技术[J].铁道工程学报,2010(3):81-86.
Zhang Mei, Zhang Minqing, Sun Guoqing. Technology for Treating Burst Port of Filling Solution Cavity with High-pressure and Rich Water of Yesanguan Tunnel on Yichang-Wanzhou Railway[J]. Journal of Railway Engineering Society, 2010(3):81-86.
[5]张民庆, 孙国庆.隧道突泥突水灾害处治技术[J].现代隧道技术,2011(6):117-123.
Zhang Minqing, Sun Guoqing. Treatment Technology for Mud and water Bursting in Tunneling[J]. Modern Tunnelling Technology, 2011(6):117-123.
[6]张民庆, 汪纲领, 孙国庆.南广铁路白云隧道断层突泥灾害治理技术[J].铁道工程学报,2012(3):69-73.
Zhang Minqing, Wang Gangling, Sun Guoqing. Treatment Technology for Mud Bursting of Fault in Nanguang Railway BaiYun Tunneling[J]. Journal of Railway Engineering Society, 2012(3):69-73.
|
|
|
|