|
|
Research on the Scheme for Leading New Chengdu-Kunming Railway into Guangtong Area |
YU Hao-wei,HE Zhuan,ZENG Cheng,WANG Li-jun |
China Railway Eryuan Engineering Group Co.Ltd, Chengdu, Sichuan 610031,China |
|
|
Abstract Guangtong lies in Chuxiong of Yunnan Province,has special geographical location,is one of the necessary stronghold of Chengdu-Kunming Railway,has a lot of paths which should be linked up. But the surrounding terrain conditions are difficult, the level height difference is big, the setting conditions of contract line are adverse. So it is necessary to study to guide the engineering design and provide a reference for the similar project.Research conclusions:(1) For the area with new line and existing line, should first study the functions and their respective division, as the basis of general drawing program research. (2) Use of annular contact line, can greatly shorten the contact line length, save the engineering investment, but has a certain influence to the capacity and operation of the station, which should be seriously considered before select and use. (3)Area programs should take full account of the introduction of existing facilities and existing lines,enhance the social and economic benefits.(4)Area programs should be in accordance with the general plan of economic, practical principles unified planning, related projects should be timely implemented according to the traffic growth situation, to reduce the initial one-time investment. (5) The research results can be applied to area general drawing program which determines similar double "T" shaped structure.
|
Received: 29 March 2014
|
|
|
|
|
[1] GB 50090—2006,铁路线路设计规范[S]. GB 50090—2006,Code for Design of Railway Line [S]. [2] GB 50091—2006,铁路车站及枢纽设计规范[S]. GB 50091—2006, Code for Design of Railway Station and Terminal [S]. [3] 铁道第四勘察设计院. 铁路工程设计技术手册(站场及枢纽)[M].北京:中国铁道出版社,2004. The Fourth Survey and Design Institute of China Railway. Railway Engineering Technical Manual(Station Yard and Terminal)[M].Beijing: China Railway Publishing House,2004. [4] 成昆铁路技术总结委员会.成昆铁路:第二册(线路、工程地质及路基)[M].北京:人民铁道出版社,1980. Chengdu-Kunming Railway Board of Technical Summary. Chengdu-Kunming Railway:Volume II(Route, Engineering Geology and Roadbed)[M]. Beijing:China Railway Publishing House,1980. [5] 铁道部第二设计院.成昆铁路勘测设计总结[R].成都: 铁道部第二设计院,1976. China Railway Eryuan Engineering Group Co. Ltd. Chengdu-Kunming Railway Survey and Design Summary[R].Chengdu:China Railway Eryuan Engineering Group Co. Ltd,1976. [6] 中铁二院工程集团有限责任公司.改建铁路成都至昆明线永仁至广通段可行性研究总说明书[R]. 成都: 中铁二院工程集团有限责任公司,2011. China Railway Eryuan Engineering Group Co. Ltd. The Total Manual of Feasibility Study for Yongren-Guangtong of Chengdu-Kunming Railway[R]. Chengdu:China Railway Eryuan Engineering Group Co. Ltd,2011. [7] 余浩伟,方宜.成昆线燕岗至广通段扩能方案研究[J].铁道工程学报,2013(12):10-14. Yu Haowei, Fang Yi. Research on the Expansion Plan for Yangang to Guangtong of Chengdu-Kunming Railway[J]. Joural of Railway Engineering Society,2013(12):10-14. |
|
|
|