Breakthrough Error Estimation of Undersea Tunnel of Bohai Strait and Its Control Network Precision Design |
ZHANG Guan-jun, WANG Bing-hai |
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China |
|
|
Abstract In order to study the influence of the undersea tunnel of Bohai Strait construction control survey on construction completed, the breakthrough error is estimated and analyzed based on the designed undersea tunnel with the longest length. According to the breakthrough error, the precision of construction control network is designed. Research conclusions:(1)The breakthrough error of tunnel affected from four aspects, such as outside tunnel GPS control survey, inside tunnel traversing, outside height transfer across the strait and inside tunnel leveling. The inside tunnel traversing and outside height transfer across the strait have more significant impact on breakthrough error. (2)This paper has proposed some suggestions about the tolerance of breakthrough error of the Bohai Strait tunnel between the longest breakthrough faces, and the solution on precision design of horizontal and vertical control network of inside and outside tunnel. (3)By the current measuring tools, methods and accuracy, the surveying technology for the construction and the breakthrough of Bohai Strait undersea long tunnel is feasible, and its breakthrough error is controllable. (4)The research results have important reference value for the technical plan making and its implementation of construction control survey for undersea tunnel of Bohai Strait railway corridor and similar project.
|
Received: 21 April 2014
|
|
|
|
|
[1] 卢光杰,田宝红.渤海海峡跨海通道建设方案研究[J].铁道标准设计,2013(8):37-41. Lu Guangjie, Tian Baohong. Research on Development Scheme of Sea-crossing Railway through the Bohai Channel[J]. Railway Standard Design,2013(8):37-41. [2] 姚连璧,李文全.隧道GPS网横向贯通误差的计算[J].铁道工程学报,1995(4):80-85. Yao Lianbi, Li Wenquan. The Calculation of Tunnel GPS Network on the Precision of the Lateral Link-up[J]. Journal of Railway Engineering Society,1995(4):80-85. [3] TB 10601—2009,高速铁路工程测量规范[S]. TB 10101—2009,Code for Engineering Survey of High-speed Railway[S]. [4] GB/T 12897—2006,国家一、二等水准测量规范[S]. GB/T 12897—2006,Specifications for the First and Second Order Leveling[S]. [5] GB/T 18314—2009,全球定位系统(GPS)测量规范[S]. GB/T 18314—2009,Specifications for Global Positioning System(GPS) Surveys[S]. [6] 孔祥元,梅是义.控制测量学[M].武汉:武汉大学出版社,2002. Kong Xiangyuan, Mei Shiyi . Control Surveying[M] . Wuhan:Wuhan University Press, 2002. [7] 武汉大学测绘学院测量平差学科组.误差理论与测量平差基础[M].武汉:武汉大学出版社,2003. Scholl of Geodesy and Geomatics, Wuhan University . Error Theory and Foundation of Surveying Adjustment[M]. Wuhan:Wuhan University Press, 2003. [8] 张项铎,张正禄.隧道工程测量 [M].北京:测绘出版社,1998. Zhang Xiangduo,Zhang Zhenglu. Tunnel Engineering Survey[M] . Beijing:Surveying and Mapping Press, 1998. |
|
|
|