[1]TB 10012—2007,铁路工程地质勘察规范[S].
TB 10012—2007,Code for Geology Investigation of Railway Engineering [S].
[2]铁道部第一勘测设计院.铁路工程地质手册(修订版)[M].北京:中国铁道出版社,2002.
The First Railway Survey and Design Institute. Handbook of Railway Engineering Geology[M]. Beijing:China Railway Publishing House,2002.
[3]李国和.采空区铁路工程地质选线研究[J].铁道工程学报,2012(10):15-20.
Li Guohe. Research on Railway Alignment in Goal[J]. Journal of Railway Engineering Society,2012(10):15-20.
[4]国家煤炭工业局. 建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M]. 北京:煤炭工业出版社,2000.
State Bureau of Coal Industry.Rules for Coal Pillars Reserving and Mining Coal under Buildings,Water,Railroad,Main Roadway and Shaft[M]. Beijing: China Coal Industry Publishing House,2000.
[5]TB 10027—2012,铁路工程不良地质勘察规范[S].
TB 10027—2012,Code for Unfavorable Geological Condition Investigation of Railway Engineering [S] |