Research on the Design of Shiziyang Tunnel across Pearl River on Guangzhou-Shenzhen-Hongkong Passenger Dedicated Line |
HUANG Dun1,FU Zhen1,HUANG Guang2 |
1. China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan, Hubei 430063,China; 2. China University of Geosciences, Wuhan, Hubei 430000,China |
|
|
Abstract Research purposes: The Shiziyang Tunnel crossing Pearl River on the Guangzhou-Shenzhen-Hongkong passenger dedicated line is the first two-lane railway tunnel across the major rivers constructed according to the highest technical standards in China so far. But the design nouns and standards of the corresponding water supply and drainage system and fire fighting system is still lacked. The research and discussion on the design of water supply and drainage system and fire fighting system were provided referring to the existing design norms and standards and the design of overseas similar projects. The decided scheme and main parameters of this design might conduce to the design of future similar projects.
Research conclusions: Several factors should be taken into account during the design of water supply and drainage system and fire fighting system of railway tunnel crossing a river according to our research and discussion on the design of Shiziyang Tunnel crossing Pearl River on the Guangzhou-Shenzhen-Hongkong passenger dedicated line. Three independent fire fighting systems( i. e.,hydrant, water spray and fire extinguisher) were set simultaneously. To put out the fire not caused by oil, the water spraying system that is high efficient, water-saving and environmental protective was recommended, while the water sprinkle system was not recommended. The water supply system must meet the requirements of total water consumption, water quality, water pressure and the safety standards. The drainage system includes sewage drainage system and rainwater drainage system. Pump room is set at the lowest point of the tunnel for wastewater discharge from fire fighting, rinse and structure leakage. Both wastewater and rainwater were discharged into nearby water body.
|
Received: 15 April 2008
|
|
|
|
|
[1] GBJ 50015—2003,建筑给水排水设计规范[S].
[2] GBJ 50016—2006,建筑设计防火规范[S].
[3] GBJ 50140—2005,建筑灭火器配置设计规范[S].
[4] GBJ 50219—1995,水喷雾灭火系统设计规范[S].
[5] GBJ 50013—2006,室外给水设计规范[S].
[6] GBJ 50014—2006,室外排水设计规范[S].
[7] JTG/D 71—2004,公路隧道交通工程设计规范[S].
|
|
|
|