铁道工程学报  2008, Vol. 25 Issue (8): 67-70    DOI:
Current Issue | Archive | Adv Search |
Research on the Compensation Modes of Parallel Reactor for Qinghai-Tibet Railway Continuous Power Cable Lines
WANG HAO1,YI Dong2
1. China Railway First Survey and Design Institute Group Ltd.,Xi'an, Shanxi 710043,China; 2. Southwest Jiaotong University , Chengdu, Sichuan 610031,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech