Analyses of the Embedment Depth of Underground Continuous Wall |
GAO Xi-liang |
China Railway Eryuan Engineering Group Co. Ltd , Chengdu , Sichuan 610031, China |
|
|
Abstract Research purposes: Taking excavation of the foundation pit for the underground two-storey station of Shanghai rail transit as an example, the analysis of the relation between reliability and embedment depth of exterior- protected structure is made with the reliable design theory for the purpose of determining the suitable embedment depth of exterior-protected structure.
Research conclusions: The lateral horizontal displacement of underground continuous wall is not reduced endlessly with deepening the embedment depth, so underground continuous wall will play little role in control of the horizontal displacement of foundation pit when its embedment reaches at a certain depth. The embedment depth is determined by the analysis method of ”damage probability",which not only can guarantee the stability of foundation pit, but also can reduce the construction cost.
|
Received: 22 January 2008
|
|
|
|
|
[1] 袁金荣.地下施工变形的智能控制与预测研究[M].上 海:同济大学,2001.
[2] DGJ 08—109—2004,城市轨道交通设计规范[S].
[3] SZ—08—2000,上海地铁基坑工程施工规程[S].
[4] 刘建航,钱学渊.基坑设计手册[K].北京:中国建筑工 业出版社,1996.
[5] GB 50157—2003,地铁设计规范[S].
|
|
|
|