|
|
COMMENTS ON RAPID CONSTRUCTION OF SUBMARINE TUNNEL FOR XIAMEN EAST CORRIDOR |
FAN Heng-xiu, HAO Xiao-su |
The First Engineering Bureau Group Co. Ltd. of Chinese Railway |
|
|
Abstract This paper analyses the division of engineering section, arrangement of construction schedule and service for rapid construction of submarine tunnel from strategy, presents the roles in rapid construction of submarine tunnel by adopting key techniques for advanced geological forecast, treatment of weathered trough, water proofing and air ventilation from tactics.
|
Received: 28 July 2004
|
|
|
|
|
[1]中交第二公路勘察设计研究院.厦门东通道工程可行性研 究报告[R]. |
|
|
|