The Influence of High Pressure Aquifer on Construction of Hangzhou Subway and Its Countermeasures |
ZHU Chun-lei |
Hangzhou Metro Group Co. Ltd,Hangzhou,Zhejiang 310017,China |
|
|
Abstract Research purposes: The complicated hydrogeological condition is a great challenge confronted in the construction of Hangzhou subway. Especially,the construction risk caused by the high pressure aquifer along the Qiantang River cannot be ignored. This paper summarizes the features of high pressure aquifer in Hangzhou which has great impacts on the subway construction. The problems of high pressure aquifer in the projects of cross-river tunnel and riverside deep foundation of Hangzhou Metro Line 1 .and the corresponding control measures,are particularly introduced. Additionally,the practical implementation effects are also analyzed. This paper aims to provide the reference to the construction of Hangzhou subway.
Research conclusions: Technical solutions to the problem of high pressure aquifer in the construction of Hangzhou subway are proposed as below:(1)The brine freezing method in conjunction with the mode of tunneling shield reaching the shaft underwater is used to avoid the risk of quicksand and water gushing. (2)The preventive measures against water gushing based on the structure optimization of shield are set, including two inverted one-way restrictors installed in the conveyer and two rings of wire brush seal appended a ring of steel plate brush seal; and the EPDM rubber gasket with water pressure resistance of 0.9MPa is determined to use as waterproof measures of segment joint.(3)The connected aisle under the river is constructed by the subsurface excavation technology and reinforced by a new freezing method,the frost heave and thaw collapse of which is controlled by the deformation of tunnel linings.(4)Combined with the foundation engineering of Jiangling Road station,a complex pressure reduction and dewatering technology is developed, which is to form a complete shut-off waterproof curtain by overlapping a grouting curtain with a certain depth beneath the toe of diaphragm wall. (5)The technical solutions to the problem of high pressure aquifer encountered in the subway construction mentioned in this paper guarantee the successful engineering implementation of Hangzhou Metro Line 1, which can provide valuable experience to the subsequent construction of Hangzhou subway.
|
Received: 23 December 2013
|
|
|
|
|
[1]沈林冲,周顺华,张金荣,等.杭州地铁1号线穿越钱塘江工程理论与实践[M].北京:人民交通出版社,2012.
Shen Linchong, Zhou Shunhua, Zhang Jinrong, etc. Theory and Practice of Shield Tunnel of Hangzhou Metro Line 1 under Qiantang River[M].Beijing China Communications Press, 2012.
[2]沈林冲.杭州地铁1号线下穿钱塘江工程的若干技术问题[J].城市轨道交通研究,2011( 9 ) : 84-88.
Shen Linchong. Technologic Problems for Shield Tunnel of Hangzhou Metro Line No. 1 under Qiangtang River [J].Urban Mass Transit, 2011(9) ;84-88.
[3]周文波.盾构法隧道施工技术及应用[M].北京:中国建筑工业出版社,2004:99.
Zhou Wenbo. Shield Tunnelling Technology[M]. China Architecture and Building Press, 2004:99.
[4]杜建华.广州地铁三号线盾构法穿越珠江施工技术[J]. 铁道建筑,2008(10):41-44.
Du Jianhua. Construction Technologies of Shield Tunnel under the Pearl River of Guangzhou Metro Line 3[J]. Railway Engineering, 2008 (10) ; 41-44.
[5]王明胜.土压平衡盾构穿越珠江关键性施工技术[J]. 地下空间与工程学报,2007(8):1518-1524.
Wang Mingsheng. Key Technology for EPB Shield Underpassing the Pearl River [J].Chinese Journal of Underground Space and Engineering, 2007 ( 8):1518- 1524.
[6]王阳,胡昊,刘永新.南京长江越江盾构隧道工程项目施工风险管理[J].基建管理优化,2010(3);6-9.
Wang Yang, Hu Hao, Liu Yongxin. Construction Risk Management of Shield Tunnel under the Yangtze River in Nanjing[J].Management Optimization of Infrastructure Construction, 2010(3) ;6-9.
[7]白恒恒.地铁某车站工程施工降水研究[J].铁道工程学报,2012(8):89-93.
Bai Hengheng. Research on Water Lowering During Construction of Subway Station(J).Journal of Railway Engineering Society, 2012(8) ;89-93.
[8]季昌,许恺,贾煌.复杂地层内地铁联络通道冻结施工冻胀控制研究[J].华东交通大学学报,2011(6);17- 23.
Ji Chang, Xu Kai, Jia Yu. A Research on Frozen- heave Control of Freezing Method Applied to the Subway Connected Aisle in Complex Strata[J]. Journal of East China Jiaotong University, 2011(6): 17-23.
[9]李培妍,宋福贵,宫全美,等.高承压水条件下地铁深基坑减压降水研究[J].华东交通大学学报,2012 ( 4 ) ; 40-45.
Li Peiyan , Song Fugui , Gong Quanmei , etc. Pressure Reduction Dewatering in Deep Foundation Pit of Subway under High Confined Water[J].Journal of East China Jiaotong University, 20129(4) ;40-45.
|
|
|
|