Hu Hanzhou,Liu Ziming,Qin Shunquan. Technical Summary of Tianxingzhou Changjiang River Rail - cum - road Cable - stayed Bridge in Wuhan[M]. Beijing: China Railway Publishing House,2009.
[4] 马坤全,王志平. 大跨度铁路斜拉桥抗震性能研究[J]. 铁道标准设计,2005(4) :47-52.
Ma Kunquan, Wang Zhiping. Research on Seismic Performance of Long Span Cable - stayed Railway Bridge[J]. Railway Standard Design,2005 (4) : 47-52.
[5] 陈开利,余天庆. 混合梁斜拉桥结合段设计技术的新发展[J]. 铁道标准设计,2006(5) :43-44.
Chen Kaili, Yu Tianqing. New Development of the Design Technology for the Composition Section in Cable - stayed Bridge with Hybrid Girder [J]. Railway Standard Design,2006(5) : 43-44.
[6] 徐升桥,刘永锋. 北京市六环路斜拉桥设计关键技术[J].铁道标准设计,2009(11) :52-55.
Xu Shengqiao,Liu Yongfeng. Key Technology of the Cable - stayed Bridge Design in Sixth Ring Road of Beijing[J]. Railway Standard Design,2009(11) : 52-55.
[7] 王富君. 跨既有铁路矮塔斜拉桥设计与转体施工[J]. 铁道标准设计,2011(3) :58-61.
Wang Fujun. The Design and Swing Method for the Low - pylon Cable - stayed Bridge that Cross the Railway Existed[J]. Railway Standard Design,2011 (3) :58-61.
[8] 易伦雄. 大跨度铁路桥梁桥型方案构思与设计[J]. 桥梁建设,2005(2) :33-36.
Yi Lunxiong. Conception and Design of Proposed Bridge Types for Long - span Railway Bridge[J]. Bridge Construction,2005(2) : 33-36.
[9] 王伯惠. 斜拉桥结构发展和中国经验( 上册) [M]. 北京: 人民交通出版社,2003.
Wang Bohui. Structural Development of Cable Stayed Bridges and Chinese Experience ( Top Volume) [M]. Beijing: China Communications Press,2003.
[10] 刘士林. 斜拉桥[M]. 北京: 人民交通出版社,2002.
Liu Shilin. Cable - stayed Bridge[M]. Beijing: China Communications Press,2002.
[11] 严国敏. 现代斜拉桥[M]. 成都: 西南交通大学出版社, 1996.
Yan Guomin. Modern Cable - stayed Bridge [M]. Chengdu: Southwest Jiaotong University Press,1996.
[12] 易鹏. 大跨度公铁两用斜拉桥计算模型简化的探讨[J].铁道标准设计,2003(9) :16-17.
Yi Peng. Discussion on the Simplicity of the Computation Model for Long - span Rail - cum - road Cable - stayed Bridges[J]. Railway Standard Design, 2003(9) : 16-17.