改革勘测程序改变地质工作的滞后局面

卓宝熙

铁道工程学报 ›› 1995, Vol. 12 ›› Issue (4) : 29-34.

PDF(449 KB)
PDF(449 KB)
铁道工程学报 ›› 1995, Vol. 12 ›› Issue (4) : 29-34.
路网研究

改革勘测程序改变地质工作的滞后局面

  • 卓宝熙
作者信息 +

IMPROVEMENT OF SURVEYING PROCEDURE FOR CHANGING RETARDING SITUATION OF GEOLOGIC WORKS

  • Zhou Baoxi
Author information +
文章历史 +

摘要

指出铁路地质工作的滞后被动局面及其造成的原因。并针对地质工作的被动局面,提出改革勘测程序、对初测地质工作内容和深度进行必要改革、以及加强地质综合勘探工作等措施,以改变地质工作滞后的被动局面。

Abstract

The paper points out the passive retarding situation of the railway geologic works and its creating reasons. Being aimed at passive situation of the geologic works, in order to change this passive retarding situation, several measures are suggested in this paper, such as inv- proving the surveying procedure, proceeding necessary reformation to the contents and depth of the geologic works in the preliminary surveying, and strengthening the geologic synthetical prospecting works* etc.

Key words

surveying procedure / geologic work

引用本文

导出引用
卓宝熙. 改革勘测程序改变地质工作的滞后局面[J]. 铁道工程学报, 1995, 12(4): 29-34
Zhou Baoxi. IMPROVEMENT OF SURVEYING PROCEDURE FOR CHANGING RETARDING SITUATION OF GEOLOGIC WORKS[J]. Journal of Railway Engineering Society, 1995, 12(4): 29-34

PDF(449 KB)

2612

Accesses

0

Citation

Detail

段落导航
相关文章

/