准高速铁路PC连续刚构斜拉桥研究

裴若娟

铁道工程学报 ›› 1995, Vol. 12 ›› Issue (4) : 70-79.

PDF(464 KB)
PDF(464 KB)
铁道工程学报 ›› 1995, Vol. 12 ›› Issue (4) : 70-79.
路网研究

准高速铁路PC连续刚构斜拉桥研究

  • 裴若娟
作者信息 +

RESEARCH ON FEASIBILITY OF DESIGNNING CABLE — STAYED BRIDGE WITH PC CONTINUOUS RIGID -STRUCTURE IN QUASI-HIGH-SPEED RAILWAY

  • Pei Ruojuan
Author information +
文章历史 +

摘要

本文通过对我国第一座准高速铁路双塔斜拉桥的空间分析,提出以塔梁自 固接、墩梁固接、棺型箱梁的连续刚构斜拉桥方案。

Abstract

Based on the space analysis of the China’s first cable—stayed bridge with double bridge tower built in the quasi—high—speed railway,this paper proposes a scheme of the ca?ble—stayed bridge with continuous rigid structure which consists of the fix—jointed bridge tower and girder,the fix—jointed bank pier and girder and the channeled box girders.

Key words

quasi—high—speed / fix—jointed bridge tower and girder / fix—jointed bank pier and girder / channeled box girder / cable &mdash / stayed bridge with continuous rigid structure

引用本文

导出引用
裴若娟. 准高速铁路PC连续刚构斜拉桥研究[J]. 铁道工程学报, 1995, 12(4): 70-79
Pei Ruojuan. RESEARCH ON FEASIBILITY OF DESIGNNING CABLE — STAYED BRIDGE WITH PC CONTINUOUS RIGID -STRUCTURE IN QUASI-HIGH-SPEED RAILWAY[J]. Journal of Railway Engineering Society, 1995, 12(4): 70-79

PDF(464 KB)

2618

Accesses

0

Citation

Detail

段落导航
相关文章

/