Based on the par ticular si tuatio ns o n the reform o f the existing Bao-Cheng, Cheng- Kun and Chua n-Qian Rai lway s, the a uthor proposes sev eral opinions concerned wi th the running speed, po si tio n of No. Ⅱ rai lw ay line, desig n g radient , const ruction method, etc. The problems w hich sho uld be taken inte a ttention are also pro posed.
SUN Shaol in. , {{custom_author.name_en}}et al.
PROBLEMS CONCERNED WITH THE REFORM OF EXISTING RAILWAYS[J]. Journal of Railway Engineering Society, 1998, 15(4): 77-82