[1] 铁道第四勘察设计院.改建铁路湘桂线衡阳至永州段扩 能提速工程预可行性研究[R].武汉:铁道第四勘察设计 院, 2003. Fourth Survey and Design Institute of Railway. Pre - feasibility Study for Rebuilt Xiang-Gui Railway Project from Hengyang to Yongzhou by Increasing Capacity and Speedup [R ]. Wuhan: Fourth Survey and Design Institute ofRailway, 2003.
[2] 中铁第四勘察设计院集团有限公司.改建铁路石门至长沙线增建第二线工程预可行性研究[R ].武汉:中铁第四勘察设计院集团有限公司, 2008.
China Railway Siyuan Survey and Design Group Co.Ltd. Rebuilt Railway Pre-feasibility Study for Newly Built Second line from Shimen to Changsha [R ].Wuhan: China Railway Siyuan Survey and Design Group Co.Ltd, 2008.
[3] 中铁第四勘察设计院集团有限公司.改建铁路娄底至邵阳扩能改造工程预可行性研究[R ].武汉:中铁第四勘察设计院集团有限公司, 2008.
China Railway Siyuan Survey and Design Group Co.Ltd. Rebuilt Railway Pre-feasibility Study for Increasing Capacity from Loudi to Shaoyang [R ].W uhan: China Railway Siyuan Survey and Design Group Co.Ltd, 2008.
[4] 铁一院.铁路工程设计技术手册(线路)(修订版) [K ].北京:中国铁道出版社, 1994.
FSDI. Technological Handbook for Design of Railway Engineering (Route) (Revised Edition) [K ]. Beijing: Chinese Railway Publishing House, 1994.
[5] GB 50090)2006,铁路线路设计规范[S].GB 50090)2006,Code for Design ofRailway L ine[S].
[6] 中铁第四勘察设计院集团有限公司.改建铁路宁西线南阳至合肥段增建第二线工程预可行性研究[R].武汉:中铁第四勘察设计院集团有限公司, 2008.
China Railway Siyuan Survey and Design Group Co.Ltd. Pre-feasibility Study for Rebuilt Railway andNewly Built Second Line from Nanyang to Hefei [R ].Wuhan: China Railway Siyuan Survey and Design Group Co.Ltd, 2008.
[7] 中铁第四勘察设计院集团有限公司.改建铁路皖赣线增建第二线工程预可行性研究[R].武汉:中铁第四勘察设计院集团有限公司, 2008.
China Railway Siyuan Survey and Design Group Co.Ltd. Rebuilt Wan -Gan Railway Pre-feasibility Study for Newly Built Second Line [R ]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd,2008.
[8] 魏州泉.包西铁路通道改建方案研究[J].铁道工程学报, 2010(6): 1 -4.
Wei Zhouquan. Study on Scheme for Reconstruction of Baotou -Xi 'an Railway Corridor [ J ]. Journal of Railway Engineering Society, 2010(6): 1 -4.
[9] 黄远清.珠三角城际轨道交通正线线间距研究[J].铁道工程学报, 2010(6): 23 -26.
Huang Yuanqing. Studuon Midway between Tracks of Main Line of Intercity Rail Transit in Pearl River Delta Zone[J]. Journal of Railway Engineering Society, 2010 (6): 23 -26.
[10]中铁第四勘察设计院集团有限公司.改建铁路赣龙铁路复线预可行性研究[R ].武汉:中铁第四勘察设计院集团有限公司, 2008.
China Railway Siyuan Survey and Design Group Co.Ltd. Rebuilt Railway Pre -feasibility Study for Double Lines from Ganzhou to Longyan [R ]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd,2008.