合福客专铜陵长江大桥主桥5 号墩承台施工技术

黄旺明,缪玉卢

铁道工程学报 ›› 2011, Vol. 28 ›› Issue (11) : 72-76.

PDF(1339 KB)
PDF(1339 KB)
铁道工程学报 ›› 2011, Vol. 28 ›› Issue (11) : 72-76.
路网研究

合福客专铜陵长江大桥主桥5 号墩承台施工技术

  • 黄旺明,缪玉卢
作者信息 +

Construction Technology for Pile Cap of Pier 5 of Tongling Yangtze River Bridge of Hefei - Fuzhou Passenger Dedicated Line

  • HUANG Wang - ming,MIAO Yu - lu
Author information +
文章历史 +

摘要

研究目的:铜陵长江大桥主桥5 号墩位于长江大堤坡脚处,承台施工时的基坑大开挖无疑会对长江大堤造成巨大的破坏,必须采取可靠的基坑支护方式,尽快完成承台施工及基坑的回填,确保承台施工后能够完全恢复大堤的原有防洪功能。
研究结论:承台基坑支护方案经过多种方案的对比分析后,采用了支护结构易于施工及基坑内便于机械开挖取土的单层内支撑钢板桩围堰支护方式,施工简便快捷,又可确保长江大堤在施工期间的安全及施工后的可恢复性; 承台混凝土一次性整体浇筑,根据承台大体积混凝土施工期的水化热温度场仿真分析的结果,采用了埋设冷却水管路降温系统和电子测温元件的温度监测系统,有效保证了承台混凝土的施工质量。

Abstract

Research purposes: The pier 5 of Tongling Yangtze River Bridge is located in the toe area of the Yangtze River levee. During construction of the pile cap,the excavation work of the large foundation pit would no doubt cause big damage to the Yangtze River levee. Therefore,the reliable support way for the foundation pit had to be adopted,and the construction of the pile cap and the refilling of the foundation pit had to be fulfilled as soon as possible in order to restore the original function of the levee after construction of the pile cap.
Research conclusions: After making the comparative analysis of various programs for pile foundation pit,the cofferdam bracing way with steel sheet pile in the single layer was adopted and with it the supporting structure facilitated the easy construction and mechanical excavation of borrow pit with feature that the construction could be conducted easily and rapidly to ensure the levee safety during construction period and the levee recoverability after construction. The concrete would be poured to the pile cap as a whole for one time. According to the simulation analysis result of the temperature field of hydration heat during the mass concrete construction period of the pile cap,the temperature reducing system with buried cooling water pipelines and the temperature monitoring system with electronic components were used to guarantee the concrete construction quality of the pile cap.

关键词

长江大堤 / 基坑支护 / 钢板桩围堰 / 大体积混凝土 / 温控措施 / 施工技术

Key words

Yangtze River levee / support for foundation pit / steel sheet pile cofferdam / mass concrete / temperature monitoring measure / construction technology

引用本文

导出引用
黄旺明, 缪玉卢. 合福客专铜陵长江大桥主桥5 号墩承台施工技术[J]. 铁道工程学报, 2011, 28(11): 72-76
HUANG Wang - ming, MIAO Yu - lu. Construction Technology for Pile Cap of Pier 5 of Tongling Yangtze River Bridge of Hefei - Fuzhou Passenger Dedicated Line[J]. Journal of Railway Engineering Society, 2011, 28(11): 72-76
中图分类号: U24   

参考文献

[1] 王沧州. 大体积混凝土裂缝分析及应对措施[J]. 铁道工程学报, 2010( 7) : 73 - 76.
Wang Cangzhou. Analysis of Crack of Mass Concrete and Preventive Measures [J]. Journal of Railway Enginerring Society,2010( 7) : 73 - 76.
[2] 王解军,卢二侠,李辉. 大体积混凝土施工期的水化热温度场仿真分析[J]. 中外公路, 2006( 6) : 159 - 165.
Wang Jiejun,Lu Erxia,Li Hui. Simulation Analysis of Hydration Heat Temperature Field of Massive Concrete Construction Period[J]. Journal of China & Foreign Highway, 2006( 6) : 159 - 165.
[3] 朱伯芳. 大体积混凝土温度应力及温度控制[M]. 北京:中国电力出版社, 1999.
Zhu Bofang. Temperature Stress and Control in Mass Concrete[M]. Beijing: China Electric Power Press,1999.
[4] TB 10203—2002,铁路桥涵施工规范[S].
TB 10203—2002,Code for Construction on Bridge &Culvert of Railway[S].
[5] 周水兴,何兆益,邹毅松. 路桥施工计算手册[M]. 北京:人民交通出版社, 2001.
Zhou Shuixing,He Zhaoyi,Zou Yisong. Road and Bridge Construction Manual [M]. Beijing: China Communications Press,2001.
 