长昆线桥隧相连设计研究

李冬生 马志富 许占良 陈换利

铁道工程学报 ›› 2011, Vol. 28 ›› Issue (12) : 69-73.

PDF(1107 KB)
PDF(1107 KB)
铁道工程学报 ›› 2011, Vol. 28 ›› Issue (12) : 69-73.
路网研究

长昆线桥隧相连设计研究

  • 李冬生 马志富 许占良 陈换利
作者信息 +

Design and Research of Bridge - tunnel Joint Technology on Changsha -Kunming Passenger Dedicated Line

  • LI Dong - sheng,MA Zhi - fu,XU Zhan - liang,CHEN Huan - li
Author information +
文章历史 +

摘要

研究目的: 沪昆铁路客运专线长沙至玉屏段,沿线地形起伏,存在多处桥隧相连段落。在桥隧相连设计过程中,隧道洞门能否容纳下桥台结构并有效缓解洞口空气动力学效应、隧道低洞口端洞口排水、桥隧电缆槽对接过渡以及隧道洞外存在挡墙结构时挡墙是否能起到作用并能保证施工安全等,均存在较大的难点。为解决沪昆铁路客运专线长沙至玉屏段桥隧相连的工程难题,需对桥隧相连进行专门研究。
研究结论: ( 1) 采用扩大洞门横断面 + 挖孔灌注桩方案,能有效解决桥隧串接时桥台结构伸入隧道及洞口空气动力学效应等难题; ( 2) 桥隧对接时,桥台基坑可根据条件的不同分别采用台后挖孔灌注桩防护和台后放坡两种方式开挖; ( 3) 对于桥隧对接时洞门结构外存在挡墙的情况,在挡墙下设桩基 + 托梁,并将挡墙设计为锚杆挡墙,可以解决桥台基坑开挖引起挡墙结构不稳的难题; ( 4) 通过在隧道内设置过渡段,可有效地将桥梁与隧道电缆槽顺接起来; ( 5) 隧道内低洞口端设置洞口检查井汇集洞内水体,能有效解决洞内排水问题。

Abstract

Research purposes: There are many sections of bridge - tunnel connection in Changsha - Yuping section on Shanghai - Kunming passenger dedicated line because of topographic relief effect. Various of difficulties exist in design of bridge - tunnel connection,such as whether tunnel portal can accommodate bridge abutment and effectively relieve aerodynamic effect of tunnel portal,drainage of portal in lower point of tunnel,transition of cable channels between bridge and tunnel,whether retaining wall outside of tunnel can effectively work and construct safely,and so on. In order to resolve the problem that bridge and tunnel are difficult to be connected in Changsha - Yuping section on Shanghai - Kunming passenger dedicated line,the special study on bridge - tunnel connection technology need to be done.
Research conclusions: ( 1) In bridge - tunnel connection section in series,using enlarged cross - section and digging filling piles can effectively solve the problems that bridge abutment enters tunnel difficultly and aerodynamic effect exists in tunnel portal. ( 2) According to different portal types and lengths of open cut sections,excavation methods of bridge abutment pits are classified into two types: protection of digging filling piles and step - slope excavation behind the pit in bridge - tunnel docking connection section. ( 3) For the situation that retaining wall exists outside of the portal in bridge - tunnel docking connection section,the following two measures that pile foundation and joist are set under the retaining wall and the retaining wall is designed into anchor retaining wall,can solve the difficult problems that the retaining wall is unstable because of pit excavation. ( 4) By the measure that transition section is set in tunnel portal,cable channels can link smoothly in bridge - tunnel connection section. ( 5) Inspection well which is set in the lower tunnel portal,can effectively solve the drainage problem of tunnel.

关键词

客运专线 / 桥隧相连 / 串接 / 对接

Key words

passenger dedicated line / bridge - tunnel connection section / connection in series / docking connection

引用本文

导出引用
李冬生 马志富 许占良 陈换利. 长昆线桥隧相连设计研究[J]. 铁道工程学报, 2011, 28(12): 69-73
LI Dong - sheng,MA Zhi - fu,XU Zhan - liang,CHEN Huan - li. Design and Research of Bridge - tunnel Joint Technology on Changsha -Kunming Passenger Dedicated Line[J]. Journal of Railway Engineering Society, 2011, 28(12): 69-73
中图分类号: U238   

参考文献

[1] TB 10002. 5—2005,铁路桥涵地基和基础设计规范[S].
TB 10002. 5—2005,Code for Design on Subsoil and Foundation of Railway Bridge and Culvert[S].
[2] TB 10003—2005,铁路隧道设计规范[S].
TB 10003—2005,Code for Design on Tunnel of Railway [S].
[3] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009, Code for Design of High Speed Railway[S].
[4] TB 10025—2006,铁路路基支挡结构设计规范[S].
TB 10025—2006, Code for Design on Retaining Structures of Railway Subgrade[S].
[5] TZ 331—2009,铁路隧道防排水施工技术指南[S].
TZ 331—2009,Construction Code for Waterproffing and Drainage of Railway Tunnel[S].
[6] 王飞. 山区高速公路桥隧相连技术的研究与应用[J].交通标准化,2008( 11) : 1 -4.
Wang Fei. Research and Application of Link between Bridge and Tunnel of Highway in Mountainous Areas [J]. Communications Standardization,2008( 11) : 1 - 4.
[7] 叶茂. 铁路客运专线桥隧相连段桥式方案的选择[J].城市道桥与防洪,2010( 5) : 39 -41.
Ye Mao. Selection of Bridge Scheme in Bridge and Tunnel Connecting Section of Railway Passenger Transporting Special Line[J]. Urban Roads Bridges & Flood Control,2010( 5) : 39 - 41.
[8] 陈列. 武广客运专线桥隧相连地段混凝土简支箱形梁施工方案[J]. 铁道工程学报,2007( 10) : 40 -43.
Chen Lie. Design and Research on the Construction Scheme of Concrete Simply Supported Box Girder in Bridge - Tunnel Connection Section on Wuhan - Guangzhou Passenger Dedicated Line[J]. Journal of Railway Engineering Society,2007( 10) : 40 - 43.
 