西安北站站台雨棚斜拉杆施工技术

牛震,藉敬元,王立云, 刘明保

铁道工程学报 ›› 2012, Vol. 29 ›› Issue (7) : 71-76.

PDF(776 KB)
PDF(776 KB)
铁道工程学报 ›› 2012, Vol. 29 ›› Issue (7) : 71-76.
枢纽、站场与房建

西安北站站台雨棚斜拉杆施工技术

  • 牛震,藉敬元1 ,王立云2, 刘明保2
作者信息 +

Construction Technology for PC Chord - stayed Pole of Platform Canopy of Xi'an North Station

  • NIU Zhen1,JI Jing - yuan1,WANG Li - yun2,LIU Ming - bao2
Author information +
文章历史 +

摘要

研究目的:郑西客运专线西安北站站台雨棚由钢立柱、悬挑钢梁和钢拉杆组成,钢拉杆一端与钢柱连接,另一端与雨棚相连。钢拉杆在立柱两端对称布置,并施加预应力,形成自平衡体系,减小了雨棚悬挑长度,并控制结构找形。针对工程特点,分析施工过程中影响拉杆力的各种因素,通过对施工全过程的模拟分析,确定拉杆无应力安装长度、施工张拉力等重要参数,掌握施工全过程状态。
研究结论: 针对本工程特点,通过分析得出: ( 1) 施工之前,须对结构做施工张拉全过程模拟分析,确保拉索张拉施工均处于可控状态; ( 2) 施工过程中应实时跟踪监控; ( 3) 将计算结果与监测结果进行比较,证明了有限元模拟分析的正确性以及施工方案的可行性。

Abstract

Research purposes: The platform canopy of Xi'an North Station of Zhengzhou - Xi'an Passenger Dedicated Line is composed of steel column,cantilever beam and chord - stayed pole. One end of the chord - stayed pole is connected with the steel column and the other end is connected with the canopy. The steel chord - stayed poles are arranged symmetrically on the two sides of the steel column with pre - stressing to form the self - equilibrating system for reducing the length of the canopy and controlling the shape - finding of the structure. According to the project characteristics,the various influence factors on the force of the chord - stayed pole during construction were analyzed,and by simulation analysis of the whole construction process,the important parameters of fitting length of the pole without stress and the tensioning force during construction were determined to control the whole construction process.
Research conclusions: From the analysis it is concluded ( 1) Before construction the simulation analysis of the whole tensioning process should be made to make sure the cable tensioning is in control. ( 2) The real - time and tracing monitoring should be conducted during construction. ( 3) The calculation result should be compared with the monitoring result to prove the validity of the simulation analysis with finite element and the feasibility of the construction plan.

关键词

钢雨棚 / 斜拉结构 / 模拟分析 / 施工技术

Key words

steel platform canopy / PC chord - stayed structure / simulation analysis / construction technology

引用本文

导出引用
牛震, 藉敬元, 王立云, . 西安北站站台雨棚斜拉杆施工技术[J]. 铁道工程学报, 2012, 29(7): 71-76
NIU Zhen, JI Jing - yuan, WANG Li - yun, et al. Construction Technology for PC Chord - stayed Pole of Platform Canopy of Xi'an North Station[J]. Journal of Railway Engineering Society, 2012, 29(7): 71-76
中图分类号: TU758. 11   

参考文献

[1] GB 50205—2001,钢结构工程施工质量脸收规范[S].
GB 50205—2001,Steel Structure Engineering Construction Quality Face Received Standard[S].
[2] 罗斌,郭正兴,仇荣根. 浙江大学紫金港校区体育馆钢屋盖桅杆斜拉索网施工技术[J]. 施工技术, 2010( 8) : 73 -77.
Luo Bin, Guo Zhengxing, Qiu Ronggen. Zhejiang University Campus Gymnasium Steel Roof Mast Cable Network Construction Technology [J ]. Construction Technology, 2010( 8) : 73 - 77.
[3] 蒋顺武. 巨型网格结构施工全过程模拟分析[D]. 长沙;湖南大学, 2008.
Jiang Shunwu. The Giant Grid Structure Construction Process Simulation Analysis[D ]. Changsha: Hunan University, 2008.
[4] 刘学武. 大型复杂钢结构施工力学分析及应用研究[D]. 北京: 清华大学, 2008.
Liu Xuewu. Large and Complex Steel Structure Construction Mechanics Analysis and Application[D].Beijing : Tsinghua University, 2008
[5] 王国梁,赵红玉,罗健,等. 济南车站无站台柱雨棚接触网悬挂安装方案必选[J]. 铁道工程学报, 2008( 2) : 77 -79.
Wang Guoliang, Zhao Hongyu, Luo Jian, etc.Comparison and Selection of Catenary Suspension Installed on the Platform Canopy without Post in Jinan Railway Station[J]. Journal of Railway Engineering Society, 2008( 2) : 77 - 79.
 