[1]Mario Golger, Giorhio, H.O, Friedrich Prinzl. The Pir Panjal Railway Tunnel[J]. Geomechanics and Tunneling, 2014(2) : 133-141.
[2]Pillai A S, Tiwari A K. Enhanced PERT for Programme Analysis, Control and Evaluation: Pace[J]. International Journal of Project Management, 1995(1) : 39-43.
[3]Kim K, Jesús M. de la Garza. Critical Path Method with Multiple Calenders[J]. Journal of Construction Engineering and Management-ASCE, 2005(3):330-342.
[4]Wilde E. Engineering Project Control[J]. Project Management, 1995(12):279-283.
[5]范南春. 灰色系统理论在瀑布沟水电站泄洪洞工程进度控制中的运用[D]. 成都:四川大学, 2005.
Fan Nanchun. Application of Gray System Theory in Discharge Tunnel Schedule Control at Pubugou Hydropower Station[D]. Chengdu: Sichuan University, 2005.
[6]胡连兴. 复杂长距离引水隧洞群施工全过程仿真优化与进度控制关键技术研究[D]. 天津:天津大学, 2012.
Hu Lianxin. Research on the Key Technology in the Complex Long Distance Diversion Tunnel Groups Based on the Whole Construction Process Simulation Optimization and Schedule Control[D]. Tianjin: Tianjin University, 2012.
[7]王仁超, 欧阳斌, 褚春超. 工程网络计划蒙特卡洛仿真及进度风险分析[J]. 计算机仿真, 2004(4):143-147.
Wang Renchao, Ouyang Bin, Chu Chunchao. Monte Carlo Simulation of Project Network Planning and Schedule Risk Analysis[J]. Computer Simulation, 2004(4):143-147.
[8]张云波. 工程项目工期延误原因及预警模型研究[D]. 天津:天津大学, 2003.
Zhang Yunbo. The Study on the Cause of Delay & the Model of Early Warning in Construction Project[D]. Tianjin: Tianjin University, 2003.