Abstract:Research purposes: Compared with the newly built high-speed railway, the catenary system of the existing and operational high-speed railway is more difficult and complex in the design, construction and operation of speed-upgrade improvement, with strong system correlation, variable parameters, difficult demonstration, high construction and operation risk, and lack of systematic and standard methods and ideas. Based on the example of the speed-upgrade improvement project from 300 km/h to 350 km/h in the passenger transport line between Chengdu and Chongqing, this paper comprehensively analyzed the difficulties and challenges faced in the project. From the aspects of the feasibility analysis, system performance improvement, equipment performance, construction safety and quality improvement, construction operations process and engineering inspection, the requirements and corresponding strategies of the whole process before, during and after the speed improvement were studied and put forward respectively, forming the technical route of the speed-up improvement of the high-speed catenary, and providing ideas and templates for the formation of the complete technical system of the existing and operational high-speed catenary. Research conclusions: (1) Based on the service characteristics of the catenary, the difficulties and challenges faced are put forward. (2) Based on the target demand and operation status, the technical routes are established for the speed-up improvement of the existing catenary. (3) The improvement strategy is put forward in the design, construction and operation stage. (4) The research results can provide guidance for the speed-upgrade construction of rail transit.
田长海.发展中的我国铁路列车速度、密度、重量[J].中国铁道科学,2020(4):127-135.Tian Changhai. China’s Railway Train Speed, Density and Weight in Developing[J]. China Railway Science,2020(4):127-135.
[2]
王翔,汪正兴,柴小鹏.高速铁路接触网在线实测研究[J].铁道工程学报,2014(9):97-101.Wang Xiang,Wang Zhengxing, Chai Xiaopeng. Research on the High-speed Railway Catenary Systems Online Real-time Testing[J]. Journal of Railway Engineering Society, 2014(9):97-101.
[3]
万朝中.既有铁路拨接开通前接触网提前架设及调整施工方法研究[J].上海铁道科技,2016(3):92-93.Wan Chaozhong. Study on Construction Method of Overhead Catenary Erection and Adjustment before Existing Railway Dial-up[J]. Shanghai Railway Science & Technology, 2016(3):92-93.
[4]
杨佳,林宗良,邓云川,等.400 km/h接触网技术标准体系探讨[J].高速铁路技术,2021(2):86-90.Yang Jia,Lin Zongliang,Deng Yunchuan,etc. Discussion on Technical Standard System of 400 km/h Overhead Contact System[J]. High Speed Railway Technology,2021(2):86-90.
[5]
孙海富.高速铁路设计标准优化研究[J].铁道工程学报,2020(10):1-5.Sun Haifu. Research on the Optimization of High Speed Railway Design Standards[J]. Journal of Railway Engineering Society, 2020(10):1-5.
[6]
鲁小兵. 高速铁路接触线垂向不平顺影响下的双弓-网动态特性研究[J]. 电气化铁道, 2019(6):39-46.Lu Xiaobing. Dynamic Performance of Double Pantographs-Catenary System Considering Contact Wire Vertical Unevenness in High Speed Railway[J]. Electric Railway, 2019(6):39-46.
[7]
赵隽.电气化铁路接触网几何参数检测方法与标准研究[J].中国铁路,2020(6):88-93.Zhao Jun. Research on Inspection Methods and Standards for Geometrical Parameters of Electrified Railway OCS[J]. China Railway, 2020(6):88-93.
[8]
吴积钦,杨佳, 关金发,等.中国铁路接触网数字化发展策略与实践[J].高速铁路技术,2020(4):21-27.Wu Jiqin, Yang Jia,Guan Jinfa,etc. Development and Practice of Railway Catenary Digital Technology in China[J]. High Speed Railway Technology,2020(4):21-27.