Research purposes: The diversion project from Yangtze River to Huaihe River is a national major engineering project related to the national economy and residents′ livelihood. 4 lines in the Jianghuai communication section intersect with existing railways. Down from north, they are Hefei-Jiujiang Railway, the downlink of Nanjing-Xi'an Railway, Shanghai-Chengdu Railway and the uplink of Nanjing-Xi'an Railway respectively. On the basis of expounding the general situation of the river diversion project and the railway lines involved, this paper made a comprehensive analysis from thepoints of the use of existing equipment and facilities, reducing the transition process, and reducing the impact on the existing line, and conducted a multi-scheme technical and economic comparison and research on the problems existing in the proposed diversion project from Yangtze River to Huaihe River and the existing Nanjing-Xi'an Railway downlink. Based on these works, the research focused on the line remodeling scheme and the in-situ reconstruction scheme. Research conclusions: (1) The in-situ reconstruction scheme is chosen due to its ingenious use of the adjacent abandoned Shanghai-Chengdu Railway for transition during construction, which has significant technical and economic advantages. (2) The technical innovation and design optimization of the project are also summarized, which provides experience for the existing railway reconstruction in terms of design methods and design ideas.
HU Chunlei. , {{custom_author.name_en}}et al.
Study on the Reconstruction Scheme of the Downline of Nanjing-Xi'an Railway Caused by the Diversion Project from Yangtze River to Huaihe River[J]. Journal of Railway Engineering Society, 2023, 40(10): 10-15
[1] 宋有权, 杨燕华, 程奎, 等. 引江济淮工程安徽段生态岸坡防护结构形式综述[J]. 水运工程, 2023(8): 70-76. Song Youquan, Yang Yanhua, Cheng Kui, etc. Summary of Ecological Bank Protection Structure in Anhui Section of Yangtze-to-Huaihe Water Diversion Project[J]. Port & Waterway Engineering, 2023(8):70-76. [2] JTS 181—2016,航道工程设计规范[S]. JTS 181—2016,Design Code for Waterway Engineering[S]. [3] 武琼. 南同蒲铁路黄河桥改线方案研究[J].铁道勘察,2016(1):74-77. Wu Qiong. Research on Route Change Scheme of Yellow River Bridge on South Tongpu Railway[J]. Railway Investigation and Surveying, 2016(1):74-77. [4] 李孝平, 庞凌志. 改建沪蓉铁路小角度上跨宁西下行线设计方案[J]. 铁道建筑,2018(1): 90-92. Li Xiaoping, Pang Lingzhi. Design Scheme of Reconstruction of Shanghai-Chengdu Railway Cross Nanjing-Xi'an Downline at Small Angle[J]. Railway Engineering, 2018(1):90-92. [5] 中铁第四勘察设计院集团有限公司. 引江济淮工程(安徽段)引起既有宁西、沪蓉、合九铁路改线初步设计[R].武汉:中铁第四勘察设计院集团有限公司,2016. China Railway Siyuan Survey and Design Group Co. Ltd. Preliminary Design for the Rerouting of the Existing Ningxi, Hucheng and Hejiu Railways due to the Project of Diverting the Yangtze River from the Huaihe River (Anhui Section)[R]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd. 2016. [6] 庄河. 武汉北站扩能改造及运输组织方案优化研究[J].铁道运输与经济,2019(9):1-5 Zhuang He. A Research on the Optimization of Capacity Expansion and Renovation and Transportation Organization Program in Wuhan North Station[J]. Railway Transport and Economy, 2019(9):1-5.