Abstract:Research purposes:The 90% accident of deep foundation pit in Wuhan were caused by failing control of underground water. The confined water aquifer commonly exists in the first Yangtze River's terrace with thick aquifer and high water head. This is an important feature of the deep foundation pit project in Wuhan. Therefore,studying the ground settlement caused by precipitation and excavation,the stability of the foundation pit and the change law of ground settlement has the important practical significance for the deep foundation pit project in Wuhan.
Research conclusions:The fluid - solid coupling effect of precipitation and excavation of deep foundation pit was analyzed and the coupling calculation model for the seepage field and stress field was established.The seepage - stress coupling simulation for the precipitation and excavation of the deep foundation pit in the first Yangtze River's terrace was carried out with FLAC3D.The calculation result showed that the the ground settlement formed a settlement groove of quadratic function curve,the seepage velocity was fastest under the diaphragm wall where the seepage and sabotage was easy to happen,and compared to the calculation with no coupling,the calculation result with coupling was more identical with the actual law and it could play a better role in prediction and informatization construction.
颜勇. 地铁深基坑渗流应力耦合研究[J]. 铁道工程学报, 2011, 28(6): 92-97.
YAN Yong. Research on Seepage Stress Coupling of Metro Deep Foundation Pit. 铁道工程学报, 2011, 28(6): 92-97.
[1] Lee Fook - Hou,Yong Kwet - Yew,Quan Kevin C. N.,Effect of corners in strutted excavation: field monitoring and case histories.J.of Geotechnical and Geoenvironmental Engineering,1998(4) : 339-349.
[2] WANG J X,HU L S,WU L G,etc. Hydraulic Barrier Function of the Underground Continuous Concrete Wall in the Pit of Subway Station and Its Optimization[J]. Environmental Geology,2009(57) : 447-453.
Zhang Nan,Hu Penghui. Dewatering Design and Subsidence - monitoring of Deep Foundation Pit Adjacent to Existing Railway Line [J].Journal of Railway Engineering Society,2010(9) : 1-4.
Luo Zujiang,Liu Jinbao,Li Lang.Three - dimensional Full Coupling Numerical Simulation of Groundwater Dewatering and Land Land - subsidence in Quaternary Loose Sediments[J]. Chinese Journal of Geotechnical Engineering,2008(30) : 193-198.
Li Xiaoyan.Fully Coupling Analysis Nalysis of Seepage and Stress for Deep Foundation Pit Based on Displacement Back Analysis[J].Chinese Journal of Rock Mechanics and Engineering,2004 (23) : 1269-1274.
Disucssion About the Mechamism and Quantitative Forecast of the Surface Subsidence Induced by Dewatering in Deep Foundation Pits in Wuhan Area [J].Soil Engineering and Foundation,2002(2) : 16-20.
[8] 机械工业第三勘察设计研究院.武汉市轨道交通四号线一期工程 IV 标段(工业路站) 岩土工程勘察报告[R].重庆: 机械工业第三勘察设计研究院,2009.
The Third Survey and Design Institute of Mechanical Industry. Report of Engineering Site Geotechnical Investigation for Wuhan Line 4 Railway Traffic First Phase IV Section (gongyelu station) [R].Chongqing: The Third Survey and Design Institute of Mechanical Industry,2009.