[1]李洪亮,沈可,魏洪涛. 采用桩基础的悬臂式挡墙计算分析[J]. 交通标准化,2009(23):47-51.
Li Hongliang,Shen Ke,Wei Hongtao. Cantilever Retaining Wall Calculation Analysis Adopting Pile Base[J]. Communication Standardization,2009(23):47-51.
[2]JTCD 63—2007,公路桥涵地基基础设计规范[S].
JTCD 63—2007,Code for Design of Ground Base and Foundation of Highway Bridges and Culverts[S].
[3]JGJ 94—2008, 建筑桩基技术规范[S].
JGJ 94—2008,Technical Code for Building Pile Foundation[S].
[4]JTS 167—2010, 高桩码头设计与施工规范[S].
JTS 167—2010, Design and Construction Code for Open Type Wharf on Piles[S].
[5]GB 50010—2010,混凝土结构设计规范[S].
GB 50010—2010,Code for Design of Concrete Structures[S].
[6]JTJ 248—2001,港口工程灌注桩设计与施工规程[S]
JTJ 248—2001,Design and Construction Technical Standard for Cast in-Situ Pile of Harbour Engineering[S].
[7]TB 10002.5—2005,铁路桥涵地基和基础设计规范[S].
TB 10002.5—2005,Code for Design on Subsoil and Foundation of Railway Bridge and Culvert[S].
[8]张敏,蔡海勇. 双排桩基托梁∏形结构计算理论探讨[J].山西建筑,2010(11):100-101.
Zhang Min,Cai Haiyong.Discussion on the Calculation Theory of Double Row Pile Bridle Trimmer ∏ Shape Structure[J]. Shanxi Architecture,2010(11):100-101.
[9]封志军,赖紫辉,等. 考虑桩-梁协调作用的桩基托梁计算理论分析.铁道工程学报,2012(6):33-36.
Feng Zhijun,Lai Zihui,etc. Theoretical Analysis of Calculation of Pile Foundation Joist on Consideration of Pile-beam Coordination Interaction[J]. Journal of Railway Engineering Society,2012(6):33-36 |