Abstract:Research purposes: The settlement of hish—speed railway must be strictly controlled,but it is very difficult to accurately calculate the foundation settlement in design of high—speed railway.In order to calculate the settlement of foundation accurately,a secant modulus method is offered through doing the indoor compression test on the basis of the existing research results.The final foundation settlement of railway is obtained by using the secant modulus method and the Bussinesq§solution.The verification shows this method is available and can be as the reference to the similar works.
Research conclusions: From the comparison of the calculation results obtained with the traditional layed summation method,the secant modulus method and the angle of spread method for one actual construction project,it was found the results obtained with the secant modulus method Was close to the actual foundation settlement.This indicates that the secant modulus method iS accurate and available.
严栋. 改进的分层总和法在铁路地基沉降中的应用[J]. 铁道工程学报, 2010, 27(10): 26-29.
YAN Dong. Application of Improved Layed Summation Method in Calculation of Railway Foundation Settlement. 铁道工程学报, 2010, 27(10): 26-29.
Him Zhixia,Cui Junjie.Solution to the Control of Subgrade Settlemem for Passenger Dedicated Line[J]. Journal of Railway Engineering Society,2009(2):25— 29.
[2]魏汝龙.整理压缩试验资料的一种新方法[J].水利水 运科学研究,1980(3):90一93.
Wei Rulong. A New Method of Sorting out the Compression Test Dates[J].Hydro—Science and Research,1980(3):90—93.
Li Youyun,Xie YongU,Liu Baojian.Application of Modified Secant Modulus Method in Settlement Calculation [J]. Journal of Highway and Transportation Research and Development,2008(25): 58—65.
Drag Zhouxiang,Gong Xiaonan,Li Youyun,etc.Study on Some Problems of Settlement Calculation with Secant Modulus Method and Its Modification[J].Chinese Journal of Geotechnical Engineering,2005(3):313— 316.
Wu Lijua,Jiang Guanru,Li Anhong,etc.Test of Consolidation of Non—saturated Undisturbed suty Clay Used in Qingdao—Jinan Passenger—dedicated Railway [J].Railway Engineering,2009(S):100—104.