Abstract:Research purposes:From the angle of the construction contractor and in combination with the serious problems in the cost management for construction of passenger dedicated railway, the analysis is made for the cost components and costs controllability of the passenger dedicated line in order to take the countermeasures for cost control and make the construction costs effectively controlled.
Research conclusions:On the premise of ensuring the construction quality, safety and schedule , the construction scheme should be compared and optimized, the construction resource should be put in enough and the construction cost should be controlled to the minimum so as to optimize the general construction cost. Meanwhile, the particular countermeasures for the cost control should be taken according to the degree of the controllability of all cost elements of passenger dedicated line.
雷书华;韩同银;王淑雨. 客运专线工程项目成本可控性分析及控制对策[J]. 铁道工程学报, 2010, 27(3): 128-132.
LEI Shu-hua, HAN Tong-yin, WANG Shu-yu. Analysis of Cost Controllability and Cost Control Methods of the Passenger Dedicated Railway Construction. 铁道工程学报, 2010, 27(3): 128-132.
[ 1 ] Coper Robin. Implementing Activity Based Cost Management: Moving from Analysis to Action [J]. Montvale, N. J. Institute of Management Accountants, 1992.
[ 2 ] Lewis, Ronald J. Activity Based Models for Cost Management Systems [M]. Greenwood Publishing Group, Inc. 1995.
[ 3 ] 戚安邦.工程项目全面造价管理[M]. 天津:南开大学出版社, 2000.
Qi Anbang.Engineering Project Total Cost Management [M]. Tianjin:Nankai University Press, 2000.
Zhang Yanhui, Lei Ganglong. Key Problem s in Implementing Management of Responsibility Cost by Construction Enterprise[J]. Journal of Railway Engineering Society, 2005(4): 88 -90.
Xue Suiyun, Wei Yonggang, Wang Zhihui, etc. Application of Activity Based Costing Method to the Highway Engeering Projects[M]. Beijing: China Communications Press, 2007.
Project Management Committee of China Construction Industry Association. Enforcement Manual of the Code of Construction Project Management by Enterprises of Construction Industry(Second Edition) [M]. Beijing: China Building Industry Press, 2006, 311.
Duan Xiaochen, Lei Shuhua, Liu Fang, etc. Calculation and Control of Whole Life Cost for Railway Engeering Projects[M]. Beijing:China Railway Press, 2009.
Ren Hanbo, Zhao Liandeng, Sha Mingyuan. Management and Control of Responsibility Cost for Engeering Projects [M]. Beijing: China Building Material Industry Publishing House, 2001.