Abstract:The article introduces the construction situations of No.1 Tauhuapu Tunnel, the condition of geology, the main technical specifications of TB880E tunnel boring machine and the temporary supporting pans equipped for the rocks every factors which could influence the efficiency of working in broken zone in No.1 Tauhuapu Tunnel arc analyzed in detail. The article expounds also the improving production process, method of rock supporting process and the improving partial structure, disposition and adjusting construction technology of working control system in maintenance of boring machine and its notable effect in application.
高晓东,沙明元. 全断面掘进机在围岩破碎带作业效率分析及施工技术[J]. 铁道工程学报, 2001, 18(3): 120-124.
GAO Xiao-dong, SHA Ming-yuan. ANALYSIS OF WORKING EFFICIENCY IN TUNNEL AND COSTRUCTION TECHNOLOGY OF FULL FACE TUNNEL BORING MACHINE. Journal of Railway Engineering Society, 2001, 18(3): 120-124.
[1]Hester J C, Cighton U S, Curbs D J. Channel Tunnel UK TBM-France; The UK TBM drives[A]. In: Proceedings of 1991 Rapid Excavation and Tunneling Conference[C].1991.
[2]Dumont P. Channel Tunnel Project French worker[A]. In: Proceedings of 1991 Rapid Excavation and Tunneling Conference[C].1991.
[3]Shani Wallis. Soft ground TBMs set a cracking pace in caracas[J].Tunnels & Tunneling, Sept. 1988.
[4]Peter J. Tarkoy, John Wagner. Backing up a TBM[J]. Tunnels & Tunneling. Oct. 1988.