Abstract:After having analysed the geology of Erlangshan Tunnel and compared several kinds of be?forehand bracing technologies,the paper draws a conclusion as follows:the technique of beforehand bracing with large steel-pipe-shield is fairly effective for construction of soft and weak fracture zone, and the Ingersollrand KR80412 Pipe Shield Boring Machine offers better guarantee for this kind of bracing. Moreover ,the paper also introduces the working principle.the specification and application ef?fect of the aforesaid Boring Machine.
肖瑞文. 二郎山隧道管棚支护施工 的设备选型及应用[J]. 铁道工程学报, 1999, 16(1): 125-128.
XIAO Ruiwen. THE CHOICE OF STEEL-PIPE-SHIELD CONSTRUCTION EQUIPMENT AND ITS APPLICATION. Journal of Railway Engineering Society, 1999, 16(1): 125-128.