新线开通60 km/h及在短期内提速的探讨
阚宏明
上海铁路局工程总公司第一工程公司,上海200000
EXPLORATION ON OPERATING A RUNNING SPEED OF 60 km/h FOR NEWLY-BUILT RAILWAY AND RAISING SPEED IN A SHORT TIME
KAN Hong-ming
First Railway Engineering Co-,Railway Engineering General Corp-of Shanghai Railway Administration Abstract After the operation of a newly-built railway trunk line,it was stipulated that the running speed of 45 km /h should be limited in a rather long time. The paper describes briefly the meaning of operating a running speed of 60 km /h for the first time in a newly-built railway line and then raising speed in a short time. Through the practical construction example,the following practice has been demonstrated. For the heavy-haul and the newly-built railways, by raising the construction technical standards and applying the advanced construction technologies,it is feasible to operate a running speed of 60 km/h for the first time,and then raising speed in a short time( 4^ 6 months) up to the normal running speed of 140 km/h.

版权所有 © 2014 《铁道工程学报》编辑部
京ICP备14038223号
本系统由北京玛格泰克科技发展有限公司设计开发