Abstract:There a re 16 sta tions o n the No. I line of the Guang zhou Metro w ith a to tal leng th o f 18. 48 km. A lo t o f suppo rting tech niques fo r the deep foundation pit w ere used in the const ructio n of Guang zhou metro 's 14 underg round sta tio ns. Based on the inv estig atio n and research o f these suppo rting techniques in co nst ructio n si te, the paper ex po unds the di fferent mode of the suppor ting st ructures a nd thei r co nst ructio n methods, and analy zes thei r a pplication ef fects. The cor respo nding co nclusions o n the suppor ting desig n a nd const ruction methods fo r deep fo unda tion pit w hich are sui table fo r dif ferent g eological co ndi tio ns of Guang zhou met ro a re also propo sed.
宋 冶,高尔洋,马德云. 广州地铁一号线车站深基坑支护技术述评[J]. 铁道工程学报, 1998, 15(3): 133-143.
SONG Ye GAO Eryang MA Deyun. DISCUSSION ON SUPPORTING TECHNIQUEOF DEEP FOUNDATION PIT FOR STATIONS ON NO. I LINE OF GUANGZHOU METRO. Journal of Railway Engineering Society, 1998, 15(3): 133-143.