Abstract:The railway requirements in the Nanjing District, the present statu and its relation with the railway program are analyzed in this paper. A new scheme of building Jing-Hu high?speed railway crossing over Yangtze River at Nanjing is proposed. Various problems which may be occurred under this scheme and the measures for solving these problems are analyzed and dis?cussed. Finally, several forms of crossing over the Yangtze River are contrasted and selected.
肖时多. 南京地区铁路及其越江通道选址[J]. 铁道工程学报, 1995, 12(4): 25-28.
Xian Shiduo. RAILWAYS IN NANJING DISTRICT AND SELECTION OF POSITION CROSSING OVER YANGTZE RIVER. Journal of Railway Engineering Society, 1995, 12(4): 25-28.