Abstract:Mechanism why the collapse — landslip of soft soil embankment happened at Yongfengying station of the new railway between Nanning and Kunming and the engineering measure to reinforce -the soft soil embankment are discussed,the construction method and the monitor at the scene to this work point in handling course are discussed too,and lastly 9 the author’s realizations are described in this paper.
闵卫每. 软土路堤坍滑的机理分析与处理[J]. 铁道工程学报, 1995, 12(4): 41-49.
Min Weiging. ANALYSES ON MECHANISM AND METHOD OF DISPOSAL FOR COLLAPSE-LANDSLIP OF SOFT SOIL EMBANKMENT. Journal of Railway Engineering Society, 1995, 12(4): 41-49.