Abstract:Research purposes: Subgrade,as an artificial outdoor engineering structure made of geotechnical materials,is featured with natural characteristics which inevitably have some potential and uncertain factors of affecting the safety and quality in construction. That’s to say,the risk is to be severely controlled.
Research conclusions: The risk identification of subgrade project should be done from a specific engineering combining risk events with risk sources. The risk events must be found by the procedure of the project – sub item – branch item –construction process,as well as the risk sources at the same time from five aspects: the nature,geology,environment,design and construction,materials. The treatment of risk shall comply with the following basic principles: using the economic and reasonable technical and control measures to prevent the subgrade risks,lessening or reducing loss caused by risks and avoiding collapse,sliding,which is difficult to restore and affects normal function. subgrade risk should be controlled from its root. In the planning and design stage,the identified risk that is likely to cause the delay of schedule or cause heavy loss should be remedied by adjusting line plane or profile,adopting substitute program or other optimizing program to avert or reduce risks. Economic and rational technical measures are needed to guard against the risks in subgrade projects.
魏永幸. 路基工程风险识别与管理研究[J]. 铁道工程学报, 2013, 30(3): 91-96.
WEI Yong - xing. Research on the Risk Identification and Control of Subgrade Engineeriong. 铁道工程学报, 2013, 30(3): 91-96.
Wang Duoquan. The Practical Application of Risk Management in the Safety Management of Construction Site[J]. Journal of Railway Engineering Society,2007 ( 7) : 94 -97.
The Ministry of Railways of the People’s Republic of China. Temporary Provisions for Risk Evaluation and Management of Railway Tunneling[S]. Beijing: China Railway Publishing House,2007
The Engineering Quality Supervision Bureau, Communication & Transportation Ministry. Evaluating System and Guideline Analysis for Evaluation of Safety Risk in Construction of Highway Bridge and Tunneling [M]. Beijing: China Communication Press,2011.
The Ministry of Construction of the People’s Republic of China. Guidelines for Risk Management in Construction of Metro and Underground Works[S]. Beijing: China Architecture & Building Press,2011.
[8] GB 50652—2011,城市轨道交通地下工程建设风险管理规范[S].
GB 50652—2011,Code for Risk Management of Underground Works in Urban Rail Transit [S].
China Railway Eryuan Engineering Group Co. Ltd. Civil Engineering Institute of Southwest Jiaotong University, General Report of Study on Risk Identification and Prevention Measure of Railway Subgrade Design in Southwest Mountain Area [R]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd,2011.
[10] 岩土工程手册编写委员会. 岩土工程手册[M]. 北京: 中国建筑工业出版社,1994.
Committee on Compiling Handbook for Rock and Soil Works. Handbook for Rock and Soil Works [M]. Beijing. China Architecture & Building Press,1994.