Abstract:Research purposes : Based on the deformation control of a certain metro station in Chongqing in soil - rock composite stratum, the deformation reason and relevant countermeasures are put forward. Then, through numerical analysis,the defects of pile - anchor flexible retaining system are made clearly,and the advantage of composite retaining system of pile - anchor - strut is put forward.
Research conclusions: ( 1 )The excess deformation of foundation pit can be classified into internal and external factors. The internal factors include the interface of stratum inclining to foundation pit,the weaken of stratum interface because of rainfall,and the weak deformation control of flexible pile - anchor supporting system. The external factors include construction blast and overload due to tower crane on ground. (2) The failure of foundation pit is largely depended on excess deformation,rather than the strength failure of retaining structure. Deformation monitoring and dynamic feedback should be strengthened during construction. ( 3 ) As for the flexible pile - anchor retaining system,limited role for the control of continued deformation is found. The composite retaining system of pile - anchor - support can effectively reduce the tensile stress and deformation of anchor rod, and the stability of foundation pit can be realized. (4) The research conclusions can provide some references for similar project in future.
王鹏. 柔性基坑支护体系的局限性与应对措施研究[J]. 铁道工程学报, 2015, 32(10): 51-56.
WANG Peng. Research on the Limitation of Flexible Foundation Pit Supporting System and Its Countermeasures. Journal of Railway Engineering Society, 2015, 32(10): 51-56.