Abstract:Research purposes: Based on an underground metro station project in Beijing with complicated conditions, the comparison of the settlement regulations of the ground surface and bridge pier obtained by conducting the FLAC simulation prediction with the actual measured data was made to know the settlement regulations of the ground surface and bridge pier induced by the metro station construction with PBA method for providing the technical support for the information construction of underground metro station.
Research conclusions: (1)The FLAC simulation showed that with the excavation of the pilot tunnel, the settlement of the ground surface gradually increased. The curve of the settlement groove gradually changed from double peaks to single peak due to the influence of the load of the upper bridge and the dead weight of the bridge on the surface soil with playing a major role in the surface settlement at the beginning of the excavation. The maximum surface settlement happened in the center position of pilot tunnel excavation. The maximum predicted value of the ground settlement was 24.75mm and the measured value was 25.51mm. The maximum predicted value of the bridge pier settlement was 5.11 mm and the measured value was 5.89mm. Both were basically the same. (2)The result showed that the PBA construction scheme for metro station and the in-site monitoring scheme were reasonable in design and the deformations of the ground surface and pier met the specification requirements. (3)This research result could provide the reference to construction and monitoring of the large-section metro station in the area with poor geological conditions.
任建喜,王松,陈江,孙杰龙,孟昌,朱元伟. 地铁车站PBA法施工诱发的地表及桥桩沉降规律研究[J]. 铁道工程学报, 2013, 30(9): 92-98.
REN Jian-xi, WANG Song, CHEN Jiang, SUN Jie-long, MENG Chang, ZHU Yuan-wei. Study on Settlement Regulations of Ground Surface and Bridge Pier Induced by Metro Station Construction with PBA Method. 铁道工程学报, 2013, 30(9): 92-98.
Ding Lieyun, Li Weiming, Wu Xianguo, etc. Study on Construction Plan for Wuhan Metro in Key Area Under Complex Engineering Environment; Operational Analysis of Surrounding Light Rail Bridge[J]. Journal of Railway Engineering Society, 2010(10):87-90.
Wang Ting, Luo Furong, Liu Weining, etc. Study of Surface Settlement and Flexible Joint Pipeline Deformation Induced by Metro Station Construction with PBA Method[J]. China Civil Engineering Journa1, 2012(2):155-161.
Du Bin, Tan Zhongsheng, Wang Mengshu, Analysis of Stratum Deformation and Pile Foundation Response During Subway Station Built by Pile-Beam-Arch Construction Method[J]. Journal of Beijing Jiaotong University, 2008(3):30-36.
Song Jian, Fan Yunyun, Huo Yanpeng. Ground Surface Settlement Law of a Shallow-Depth Subway Station Under Complex Conditions[J]. Modern Tunnelling Technology, 2012(6):88-92.
[6]朱泽民.地铁暗挖车站洞桩法(PBA)施工技术[J].隧道建设, 2006(5):63-65.
Zhu Zemin. Pile-Beam-Arch (PBA) Construction Technology for Mined Metro Stations[J]. Tunnel Construction, 2006(5):63-65.
Yuan Yang, Liu Weining, Ding Deyun, etc. Analysis on Heading Excavation Optimization in Metro Station Constructed by Drift-PBA Method[J]. Chinese Journal of Underground Space and Engineering, 2011(7):1693-1696.