Abstract:Abstract:Research purposes: In recent years, urban rail transit has shown a vigorous development trend, construction and operating mileage continued to increase. Valuable experience of urban rail transit project cost control was accumulated from numerous project construction, but there has been many construction cost beyond the cost estimation. Therefore, for the characteristics of urban rail transit, such as large project scale, long construction period, difficulty on construction cost control, it is very significant to study and establish a set of urban rail transit construction cost control measures for the healthy and sustainable development of urban rail transit. Research conclusions: Regarding to the current problems in the cost management of urban rail transit, the whole process cost control's principle and measures are proposed. (1) In the pre-planning and project approval stage, an appropriate construction scale and construction standards should be chosen by combing with the actual and planning situation of the city, to provide the basis for cost control. (2) In the engineering design stage, the owner should select a preferred design company, and introduce design and cost consulting system. At the same time, design company should strengthen the awareness of cost control and carry out cost-limit design. (3) In the construction bidding and construction stage, the owner should select a preferred construction contractor, and strengthen contract management and on-site management. (4) In the completion acceptance stage, the project managers should directly participate in the completion acceptance and the project final accounts, as well as do the project audit. (5) The research conclusions of this paper are valuable to the construction cost control of urban rail transit.
李 鹏. 城市轨道交通工程造价控制措施探讨[J]. 铁道工程学报, 2017, 34(8): 89-92.
LI Peng. Discussion on the Construction Cost Control Measures for Urban Rail Transit. Journal of Railway Engineering Society, 2017, 34(8): 89-92.