Abstract:Research purposes: Passenger and freight railway stations need to handle passenger and freight operations, which have a wide variety of operations, complex operation contents and many factors of cross interference. This requires that multiple operations should be carried out simultaneously when designing the throat area of the station, and keep it safe and efficient. Based on the analysis of the technical operation content and process of stations in the section of mixed passenger and freight, and in view of the relevant specifications for the separation of driving and shunting route, this paper discusses some precautions that should be followed in the throat area of the station in order to meet the synchronous operation of driving and shunting. Finally, taking the throat area modification of an intermediate station of mixed passenger and freight as an example, this paper analyzes the specific application of driving and shunting route separation in the design of throat area of the station. Research conclusions: (1) The specific ideas and steps that should be followed in the design of station throat area are put forward. (2) By analyzing the types of train operations handled by the station, the operations that need be carried out simultaneously are identified, and the corresponding parallel paths are set in the throat area. (3) Through the design modification examples, it can provide reference and guidance for the design of throat area of passenger-freight railway station.
曾凤梅. 行车调车进路隔开在车站咽喉区设计中的运用[J]. 铁道工程学报, 2022, 39(4): 5-10.
ZENG Fengmei. Application of Driving and Shunting Routes Separation in the Design of Station Throat Area. Journal of Railway Engineering Society, 2022, 39(4): 5-10.
发改基础〔2016〕1536号,关于印发《中长期铁路网规划》的通知[S].National Development and Reform Commission Infrastructure〔2016〕No.1536,Notice on Printing and Distributing Medium and Long Term Railway Network Planning[S].
[2]
TB 10098—2017,铁路线路设计规范[S].TB 10098—2017,Code for Design of Railway Line[S].
[3]
TB 10099—2017,铁路车站及枢纽设计规范[S].TB 10099—2017,Code for Design of Railway Station and Terminal[S].
[4]
张博健.区段站到发场线路综合运用优化研究[D].成都:西南交通大学,2019.Zhang Bojian.Research on Comprehensive Optimization for Arrival-Departure Yard Tracks Utilization in Railway District Station[D].Chengdu:Southwest Jiaotong University,2019.
[5]
铁道第四勘察设计院.铁路工程设计技术手册:站场及枢纽[M].北京:中国铁道出版社,2004.The 4th Railway Survey and Design Institute.Technical Manual of Railway Engineering Design: Station and Hub[M].Beijing:China Railway Publishing House,2004.
铁建设函〔2005〕285号,新建时速200公里客货共线铁路设计暂行规定[S].Railway Construction Letter〔2005〕No.285,Interim Provisions on the Design of New 200 km/h Mixed Passenger and Freight Railway[S].
[8]
中铁第四勘察设计院集团有限公司.新建铁路瓮马铁路南北延伸线瓮安至遵义段施工图第八篇站场[R].武汉:中铁第四勘察设计院集团有限公司,2018.China Railway Siyuan Survey and Design Institute Group Co. Ltd. New Railway Weng'an-Zunyi Section of North-South Extension Line of Weng'an-Machangping Railway Construction Drawing Part Ⅷ Station Yard[R].Wuhan:China Railway Siyuan Survey and Design Institute Group Co. Ltd,2018.