Abstract:Research purposes: In order to study the stability of the high-speed railway foundation in the underpass construction process of the new tunnel, this paper takes the Qingping intercity rail transit passing through the Weifangbei-Laixi high-speed railway section as the research background, and uses FLAC3D numerical simulation software to compare and select the tunnel excavation method, and finally adopts the three-step method to excavate the new tunnel. Based on the on-site monitoring results, combined with the numerical calculation results of the stability of the high-speed railway foundation, the safety and stability of the Weifangbei-Laixi high-speed railway section are deeply discussed and analyzed. Research conclusions: (1) Both the CD method and the three-step method are suitable for this type of tunnel, but the construction efficiency of the CD method is low. It is recommended to use the three-step method to excavate the tunnel under the premise of ensuring safe construction. (2) The surface settlement shows the largest settlement at the tunnel centerline, and the smaller the settlement is farther from the tunnel centerline. (3) In the case of excavation to the edge of the high railway foundation and completion of the underpass, the increase of the settlement of the tunnel section from large to small is the tunnel vault, arch bottom, spandrel and arch foot. Specifically, the vault is 1.62 mm, the arch foot is 0.73 mm, the spandrel is 0.63 mm, and the arch bottom is 0.45 mm. (4) The research can provide technical support and theoretical reference for the design and construction of new tunnels under the existing high-speed railway foundation in a short distance.
张飞. 新建隧道下穿高铁路基施工过程稳定性分析[J]. 铁道工程学报, 2022, 39(5): 53-58.
ZHANG Fei. Stability Analysis of Construction Process of New Tunnel Passing through High-speed Railway Foundation. Journal of Railway Engineering Society, 2022, 39(5): 53-58.
胡志平,马甲宽,邓红涛,等.双连拱地铁隧道施工关键技术及力学行为模拟[J]. 铁道工程学报, 2020(3):95-100.Hu Zhiping, Ma Jiakuan, Deng Hongtao, etc. Key Technology and Mechanical Behavior Simulation of a Double-arch Subway Tunnel[J]. Journal of Railway Engineering Society, 2020(3):95-100.
[2]
张治国,黄茂松,王卫东.邻近开挖对既有软土隧道的影响[J].岩土力学,2009(5):1373-1380.Zhang Zhiguo, Huang Maosong, Wang Weidong. Responses of Existing Tunnels Induced by Adjacent Excavation in Soft Soils[J]. Rock and Soil Mechanics,2009(5):1373-1380.
[3]
张秀山,吴镇,王磊,等.富水卵石层桩底小净距盾构下穿京台高速公路桥梁变形控制措施[J].科学技术与工程,2021(29):12710-12717.Zhang Xiushan, Wu Zhen, Wang Lei, etc. Deformation Control Measures of Bridges with Small Clear Spacing in Pile Bottom Crossing Beijing-Taibei Expressway in Water-rich Pebble Layer[J]. Science Technology and Engineering,2021(29):12710-12717.
[4]
谢雄耀,张永来,周彪,等.盾构隧道下穿老旧构筑物群微沉降控制技术研究[J].岩土工程学报,2019(10):1781-1789.Xie Xiongyao, Zhang Yonglai, Zhou Biao,etc. Micro-settling Control Technology for Shield Tunnels Crossing Old Buildings[J]. Chinese Journal of Geotechnical Engineering, 2019(10):1781-1789.
[5]
周济民.盾构区间隧道下穿高架桥桩基群施工技术与环境影响预测[J].现代隧道技术,2016(1):165-172.Zhou Jimin. Construction Technology and Environmental Impact Prediction for a Shield Tunnel under a Viaduct Pile Foundation Group[J]. Modern Tunnelling Technology, 2016(1):165-172.
[6]
阳军生,杨元洪,晏莉,等.大断面隧道下穿既有高压输电铁塔施工方案比选及其应用[J].岩石力学与工程学报,2012(6):1184-1191.Yang Junsheng, Yang Yuanhong, Yan Li, etc. Construction Scheme Choice of Large-span Tunnels Under-pasing High Voltage Transmission Tower and Its Application[J]. Chinese Journal of Rock Mechanics and Engineering, 2012(6):1184-1191.
[7]
蒋关鲁,庞梅,肖东,等.新建跨线桥对高铁路基的附加影响及处治技术[J].中国铁道科学,2013(5):6-14.Jiang Guanlu, Pang Mei, Xiao Dong, etc. Additional Effects on High-speed Railway Subgrade Caused by Newly-built Flyover and Treatment Techniques[J]. China Railway Science, 2013(5):6-14.