Abstract:Research purposes: In recent years, attention has been paid on the problem of complex strata during the process of railway construction in Western China. The widely distributed Triassic slate and Neogene sandstone strata greatly increase the difficulty of tunnel construction. In this paper, based on the newly-built tunnel project of Xining to Chengdu railway crossing the Laji Mountain, in view of the complex topographic and geological conditions such as high-pressure gas, weak diagenetic strata and the characteristics of railway construction and operation in mountainous areas, the route selection and engineering problems of long length tunnel in complex strata are studied. Based on the analysis of the geological characteristics and the adaptability of the long tunnel project, and the principles and methods of railway line selection in dangerous mountain area are put forward. Research conclusions: (1) According to the engineering geological conditions and the similar engineering experience, the route scheme selection principle is determine, the adaptability of different schemes is compared and analyzed from the aspects of the construction difficulty and risk, the auxiliary tunnel setting conditions, tunnel setting and engineering investment. The results show that the tunnelling scheme bypassing the high pressure gas and passing through the shortest in weak rock stratum is optimal. (2) According to the difficulties of engineering construction, the key problems such as tunnel construction, construction scheme, high-pressure gas and tunnel structure design of weak diagenetic strata are studied respectively, and corresponding engineering measures are given. (3) The conclusions of this paper can provide reference for the subsequent similar engineering construction.
牛远程. 高压气体及弱成岩地层山区铁路综合选线[J]. 铁道工程学报, 2022, 39(8): 12-17.
NIU Yuancheng. Research on the Comprehensive Railway Line Selection in Mountainous Area of High Pressure Gas and Weak Diagenetic Stratum. Journal of Railway Engineering Society, 2022, 39(8): 12-17.
王建军.兰渝铁路三叠系板岩隧道变形机理与围岩分级预报探究[J].现代隧道技术,2013(2):79-83.Wang Jianjun. The Deformation Mechanism of a Tunnel in Triassic Slate and Forecasting Surrounding Rock Classifications[J]. Modern Tunnelling Technology, 2013(2):79-83.
[2]
刘国庆.高地应力软岩大变形隧道二次衬砌施做时机研究[J].现代隧道技术,2013(2):84-93.Liu Guoqing. On the Construction Time of a Secondary Lining for Tunnel with Large Deformation in Soft Rock with High Ground Stress[J]. Modern Tunnelling Technology, 2013(2):84-93.
[3]
刘高,魏蒙恩,谢裕江,等.甘肃新近系疏松砂岩成因[J].地质论评,2015(1):139-148.Liu Gao, Wei Mengen, Xie Yujiang,etc. Genesis of Neogene Unconsolidated Sandstones in Gansu Province[J].Geological Review, 2015(1):139-148.
[4]
中铁第一勘察设计院集团有限公司.新建铁路西宁至成都线可行性研究报告[R].西安:中铁第一勘察设计院集团有限公司,2016.China Railway First Survey and Design Institute Group Co. Ltd. Feasibility Study Report on Xining-Chengdu New Railway [R].Xi'an: China Railway First Survey and Design Institute Group Co.Ltd,2016.
[5]
李智敏,李延京,田勤俭,等.拉脊山断裂古地震与喇家遗址灾变事件关系研究[J].地震研究,2014(S):109-115.Li Zhimin, Li Yanjing,Tian Qinjian,etc. Study on the Relationship between Paleoseismic on Laji Mountain Fault and Catastrophic Event on Lajiashan Site[J]. Journal of Seismological Research,2014(S):109-115.
[6]
中铁第一勘察设计院集团有限公司.西宁至成都铁路拉脊山越岭段有害气体与地质选线研究[R].西安:中铁第一勘察设计院集团有限公司,2018.China Railway First Survey and Design Institute Group Co. Ltd. Study on Harmful Gases and Geological Route Selection in Laji Mountain Section of Xining-Chengdu Railway[R].Xi'an:China Railway First Survey and Design Institute Group Co. Ltd,2018.
[7]
张志亮.西宁至成都铁路特殊地质问题及选线研究[J].铁道工程学报,2019(12):11-16.Zhang Zhiliang. Research on the Special Geological Problems and Route Selection of the Xining-Chengdu Railway[J]. Journal of Railway Engineering Society, 2019(12):11-16.
[8]
张志亮.西秦岭北缘断裂带西端的活动性及其对西宁至成都铁路方案的影响[J].华南地震,2020(2):85-91.Zhang Zhiliang. The Activity of the West End of the Western Qinling Fault Zone and Its Influence on the Railway Project from Xining to Chengdu[J]. South China Journal of Seismology, 2020(2):85-91.
[9]
靳宝成.西宁至成都铁路甘青隧道TBM施工方案研究[J].铁道标准设计,2020(3):107-111.Jin Baocheng. Research on TBM Construction Scheme of Ganqing Tunnel on Xining-Chengdu Railway[J].Railway Standard Design, 2020(3):107-111.