Abstract:Research purposes:In view of the inconsistency of the main technical standards of the connecting line of Xiangyang North Marshalling Station and the lack of reserved uplink system conditions, this paper makes an in-depth study and discussion on the division of operation work, layout, corner traffic flow, line distribution and construction transition of the uplink and downlink system of the marshalling station, and puts forward new ideas. Research conclusions:(1)The uplink and downlink system of Xiangyang North Station adopts non-balanced division of work, which can make full use of existing facilities and equipment and reduce the interference to operation.(2)The reverse arrival route is used to introduce the North-West corner traffic flow into the uplink departure yard for axle increase and decrease. The exchange yard is composed of three shunting and exchanging lines of the uplink and three shunting and exchanging lines of downlink system for corner traffic flow treatment, which can effectively shorten the operation travel of the train in the hub, reduce frequency of locomotive pick-up and delivery trains and the interference to other technical operations, and improve the operation efficiency and capacity of the station.(3)Reducing transition times of interlocking software in construction transition design can effectively shorten the construction cycle and eliminate potential safety hazards.(4)The research conclusion can be used for reference for the scheme of new or reconstructed marshalling station.
李大军. 襄阳北编组站增建上行系统工程设计分析[J]. 铁道工程学报, 2022, 39(10): 77-81.
LI Dajun. Design of Uplink System of Xiangyang North Railway Marshalling Station. Journal of Railway Engineering Society, 2022, 39(10): 77-81.
中铁第四勘察设计院集团有限公司.改建铁路襄阳枢纽襄阳北编组站增建上行系统工程初步设计文件[Z].武汉:中铁第四勘察设计院集团有限公司,2012.China Railway Siyuan Survey & Design Group Co. Ltd.Preliminary Design Documents of Additional Uplink System Project of Xiangyang North Marshalling Station of Xiangyang Railway Hub[Z].Wuhan:China Railway Siyuan Survey & Design Group Co. Ltd,2012.
[2]
中铁第四勘察设计院集团有限公司.改建铁路襄阳枢纽襄阳北编组站增建上行系统工程施工图文件[Z].武汉:中铁第四勘察设计院集团有限公司,2012.China Railway Siyuan Survey & Design Group Co. Ltd.Construction Drawings of Additional Uplink System Project of Xiangyang North Marshalling Station of Xiangyang Railway Hub[Z].Wuhan:China Railway Siyuan Survey & Design Group Co. Ltd,2012.
[3]
严贺祥,林柏梁,郑晋荣,等.单向系统与双向系统编组站的择优比对研究[J].交通运输系统工程与信息,2007(1):124-131.Yan Hexiang,Lin Boliang,Zheng Jinrong,etc.Comparative Study on Optimal Type Selection of Marshalling Station between Unidirectional and Bidirectional [J].Journal of Transportation Systems Engineering and Information Technology,2007(1):124-131.
[4]
袁光明.成都北编组站站场设计[J].高速铁路技术,2013(1):54-59.Yuan Guangming.Design of Station and Yard of Chengdu North Marshalling Station[J].High Speed Railway Technology,2013(1):54-59.
[5]
TB 10099—2017,铁路车站及枢纽设计规范[S].TB 10099—2017,Code for Design of Railway Station and Terminal[S].
[6]
TB 10098—2017,铁路线路设计规范[S].TB 10098—2017,Code for Design of Railway Line[S].
[7]
彭文盛.新丰镇编组站改扩建平面布置方案研究[J].铁道工程学报,2010(4):112-116.Peng Wensheng.Research on the Plane Layout of Xinfengzhen Marshalling Station for Upgrading[J].Journal of Railway Engineering Society,2010(4):112-116.
[8]
丁亮.对双向系统编组站无改编折角列车径路的分析[J].铁道经济研究,2012(6):16-19.Ding Liang.Analysis on Trip Route of Non-resorted Angular Train at Double Direction Marshalling Station[J].Railway Economics Research,2012(6):16-19.