Abstract:Research purposes: The Sejilashan Mountain Tunnel is a controlling project of Ya'an-Linzhi section of plateau railway. The complex geological conditions in the tunnel site area bring great challenge to the safe and efficient construction of TBM. This paper focuses on coping strategies for difficult problems such as high ground stress rock burst, long distance tunnel ventilation on the plateau, and synchronous construction of TBM boring and secondary lining, to ensure efficient TBM construction. Research conclusions:(1) The steel pipe sheet is used to replace the steel arch support, and the steel pipe sheet installer is used to install the whole ring steel pipe sheet in the shield, so as to improve the initial support operation efficiency and support capacity of strong rock burst section. (2) Intelligent ventilation technology is adopted to effectively take into account the air quality of the tunnel and the energy consumption of fan operation. The combination of diffuse oxygen supply and emergency oxygen supply in office and living areas can meet the needs of nearly 800 people in the peak period. (4) The integrated pouring of secondary lining and low side wall and the synchronization of TBM excavation can alleviate the problem of tight construction progress of TBM tunnel. Each lining formation is equipped with two floating Y-shaped turnouts and one crossover, which can realize the "one machine and two tanks" transportation mode under four tracks and three lines, and meet the needs of continuous pouring of secondary lining. (4) The research results can provide a reference for other TBM tunnel projects in plateau railway.
李志军, 洪开荣, 陈桥, 牛彤彤, 周毅, 于京波. 高原铁路TBM法隧道施工难点分析及对策研究[J]. 铁道工程学报, 2022, 39(9): 70-78.
LI Zhijun, HONG Kairong, CHEN Qiao, NIU Tongtong, ZHOU Yi, YU Jingbo. Research on the Difficulties and Countermeasures of TBM Tunnel Construction in Plateau Railway. Journal of Railway Engineering Society, 2022, 39(9): 70-78.
卢春房,蔡超勋. 川藏铁路工程建设安全面临的挑战与对策[J]. Engineering, 2019(5):49-61.Lu Chunfang, Cai Chaoxun. Challenges and Countermeasures for Construction Safty during the Sichuan-Tibet Railway Project[J]. Engineering, 2019(5):49-61.
[2]
于群,唐春安,李连崇,等.基于微震监测的锦屏二级水电站深埋隧洞岩爆孕育过程分析[J].岩土工程学报,2014(12):2315-2322.Yu Qun, Tang Chunan, Li Lianchong, etc. Nucleation Process of Rockbursts Based on Microseismic Monitoring of Deep-buried Tunnels for Jinping Ⅱ Hydropower Station[J]. Chinese Journal of Geotechnical Engineering, 2014(12):2315-2322.
[3]
杜立杰,洪开荣,王佳兴,等. 深埋隧道TBM施工岩爆特征规律与防控技术 [J]. 隧道建设(中英文), 2021(1):1-15.Du Lijie, Hong Kairong, Wang Jiaxing, etc. Rockburst Characteristics and Prevention and Control Technologies for Tunnel Boring Machine Construction of Deep-buried Tunnels[J]. Tunnel Construction, 2021(1):1-15.
[4]
Naji A M, Rehman H, Emad M Z, etc. Static and Dynamic Influence of the Shear Zone on Rockburst Occurrence in the Headrace Tunnel of the Neelum Jhelum Hydropower Project, Pakistan[J]. Energies, 2019(11):1-17.
[5]
Dammyr . Prediction of Brittle Failure for TBM Tunnels in Anisotropic Rock: A Case Study from Northern Norway [J]. Rock Mechanics and Rock Engineering, 2016(6):2131-2153.
[6]
王文. 高原单洞单线特长铁路隧道施工通风流场模拟[D]. 兰州:兰州交通大学, 2018.Wang Wen. Simulation of Ventilation Flow Field in Construction of Single-hole Single-track Super Long Railway Tunnel in Plateau[D]. Lanzhou:Lanzhou Jiaotong University, 2018.
[7]
齐梦学. 长大隧道开敞式TBM同步衬砌施工技术应用前景及发展趋势[J]. 隧道建设, 2013(8): 679-683.Qi Mengxue.Application Prospect and Developing Trend of Synchronous Lining Construction Technology for Long Tunnels Constructed by Open TBMs[J]. Tunnel Construction, 2013(8):679-683.
[8]
TB 10003—2016,铁路隧道设计规范[S].TB 10003—2016,Code for Design of Railway Tunnel[S].