Abstract:Research purposes: In order to meet the demand of passenger and freight volume and reserve long-term development conditions, part of the railways will be built as single track in the near future, and double track construction conditions will be reserved. The second track will be built at the right time after the railway is put into operation. The single track reserved double track railway needs to coordinate the short-term and long-term transportation demand of each section, the project and implementation conditions of first track and second track, and reasonably determine the station distribution, reserved line position of second track and the recent simultaneous implementation of the project. Through the study of Quzhou-Ningde railway line scheme, this paper discusses the design method of single track reserved double track railway. Research conclusions: Single track reserved double track railway not only needs to design the first track, but also needs to reserve the conditions of the second track. (1) It is necessary to define the scope of simultaneous implementation of the second track. According to the difficulty degree of tunnel, bridge and station engineering of the first track, the left and right sides of the second track are determined by comprehensive comparison. (2) We should try to reduce the times of side changing, and choose the place of side changing according to the specific situation. (3) During the pre design of reserved second track, it is necessary to minimize the simultaneous implementation of the second track and the project shall be reserved when necessary. (4) This study can provide reference for the design of similar single track reserved double track railway.
秦国强. 衢宁铁路单线预留双线方案研究[J]. 铁道工程学报, 2022, 39(2): 19-23.
QIN Guoqiang. Research on the Scheme of Reserving Double Track for Single Track of Quzhou-Ningde Railway. Journal of Railway Engineering Society, 2022, 39(2): 19-23.
TB 10098—2017,铁路线路设计规范[S].TB 10098—2017,Code for Design of Railway Line[S].
[2]
牟瀚林.复杂山区铁路选线设计思路研究[J].铁道工程学报,2020(12):6-10.Mu Hanlin. Research on the Design Thinking of Railway Route Selection in Complex Mountainous Areas[J].Jouranl of Railway Engineering Society,2020(12):6-10.
[3]
易思蓉.铁路选线设计(第四版)[M].成都:西南交通大学出版社,2017.Yi Sirong.Principles of Railway Location and Design(Fourth Edition)[M].Chengdu:Southwest Jiaotong University Press,2017.
[4]
TB 10099—2017,铁路车站及枢纽设计规范[S].TB 10099—2017,Code for Design of Railway Station and Terminal[S].
[5]
杨健. 铁路站场及枢纽设计理念和方法探讨[J].铁道工程学报,2010(6):102-108.Yang Jian. Discussion on the Theory and Method of Railway Station and Terminal Design[J].Jouranl of Railway Engineering Society, 2010(6):102-108.
[6]
张磊,彭其渊. 山区铁路增建二线相关问题探讨[J].铁道运输与经济,2008(7):79-81.Zhang Lei,Peng Qiyuan. Discussion on Problems Related to the Construction of Additional Second Line of Railway in Mountainous Areas[J].Railway Transport and Economy,2008(7):79-81.
[7]
李敬伟. 广大单线铁路扩能改造方案研究[J].铁道运输与经济,2020(6):12-16.Li Jingwei. A Study on the Reconstruction Plan of the Guangtong-Dali Single Track Railway[J].Railway Transport and Econnmy,2020(6):12-16.
[8]
卓建成.艰险山区铁路单线预留复线合理性研究[J].铁道工程学报,2021(4):7-10.Zhuo Jiancheng. Research on the Rationality of Conditions Reservation for Future Track Doubling in Difficult Mountain Areas[J].Jouranl of Railway Engineering Society, 2021(4):7-10.