Abstract:Research purposes: A large number of practices have proved that it is a feasible technical measure to rectify the deviation of bridge by high pressure jet grouting. Through the analysis of the principle of bridge correction by foundation treatment, the theoretical model of soil erosion and damage by cement slurry jet was established. Based on the high pressure jet theory, taking maximum correction amount and minimum rebound amount, and the best correction effect as the basic solution conditions, the expression of key control parameters of rectification construction was derived, the best rotation and lifting speed of drill pipe, and the outlet pressure and the water-cement ratio of the cement slurry nozzle were determined, and were verified with the actual correction effect of typical project on site. Research conclusions: (1) When the nozzle diameter is fixed, the cement slurry jet power is proportional to the 3/2 power of the nozzle outlet pressure and inversely proportional to the 1/2 power of the cement slurry density, increasing the grouting pressure can effectively increase the jet power, and achieve a better correction effect; (2) Taking the formation conditions of construction case, the best rotation and lifting speed of drill pipe are 25.1 r/min and 16.3 cm/min respectively, the nozzle outlet pressure of the cement slurry should be 5 MPa, and the water-cement ratio should be controlled at 0.8 ∶1.0; (3) The parameters calculated were used for actual project, a good rectification effect was achieved, which indicates that the theoretical model and calculation parameters established can be used to guide the actual construction; (4) The research results can provide practical parameters for bridge correction by foundation treatment, and achieve the optimal rectification effect.
中铁四院集团岩土工程有限责任公司. 运营高速铁路桥梁沉降与偏移整治综合技术研究报告[R]. 武汉:中铁四院集团岩土工程有限责任公司,2019.China Railway Siyuan Group Geotechnical Engineering Co. Ltd. Report on Comprehensive Technology of Bridge Settlement and Migration Regulation in Operation of High Speed Railway[R]. Wuhan: China Railway Siyuan Group Geotechnical Engineering Co. Ltd,2019.
[2]
上海铁路局. 软土地区高速铁路路基及桥墩纠偏技术研究[R]. 上海:上海铁路局,2017.China Railway Shanghai Group Co., Ltd. Research on Rectification Technology of High Speed Railway Subgrade and Pier in Soft Soil Area[R]. Shanghai:China Railway Shanghai Group Co. Ltd,2017.
[3]
邓开鸿. 高压旋喷桩的成桩机理和挤土效应研究[D]. 广州:华南理工大学,2012.Deng Kaihong. Research on Mechanism and Compacting Effect of High Pressure Jet Grouting Pile[D]. Guangzhou:South China University of Technology,2012.
[4]
陈仕奇,陈占,彭志鹏,等. 用于软土地区运营高速铁路无砟轨道桥梁的纠偏系统及方法:中国,CN105780830A[P]. 2016-07-20.Chen Shiqi,Chen Zhan,Pen Zhipeng,etc. Deviation Correction System and Method for Operating High Speed Railway Ballastless Track Bridge in Soft Soil Area: China,CN105780830A[P]. 2016-07-20.
[5]
杜嘉鸿,李范山,王杰,等. 旋喷注浆破土机理研究及岩土工程应用[J]. 地质与勘探,1997(2):48-52.Du Jiahong,Li Fanshan,Wang Jie,etc. A Study on Soil Breaking Mechanism of Rotary Jet Grouting and Application of Geotechnical Engineering[J]. Geology and Prospecting,1997(2):48-52.
[6]
铁道部旋喷注浆科研协作组. 旋喷注浆加固地基技术[M]. 北京:中国铁道出版社,1984.Research and Cooperation Group of Rotary Jet Grouting of the Ministry of Railways. Rotary Jet Grouting Reinforcement Foundation Technology[M]. Beijing:China Railway Publishing House,1984.
[7]
沈忠厚. 水射流理论与技术[M]. 东营:石油大学出版社,1998.Shen Zhonghou. Theory and Technology of Water Jet[M]. Dongying:University of Petroleum Press,1998.