Abstract:Research purposes: The (120 + 120) m double track extradosed bridge is used to cross over Qingdao-Jinan passenger dedicated line and Dazheng road in a grand bridge of Handan-Jinan railway to Qingdao-Jinan railway connecting line project. The cable-stayed bridge is located on a small radius curve with R=800 m. This bridge adopts swivel construction method, whose swivel tonnage reaches 25 000 tons. In design process, the spatial beam element model, spatial beam lattice model and spatial solid element model are used for structural FEA analysis. The complex spatial stress condition is deeply analyzed, and reasonable structural measures are adopted to ensure the structural safety. Research conclusions: (1) Calculation results reliability of the main girder can be guaranteed by using spatial beam element for FEA analysis and considering the influence of curve and multiple webs uneven stress via spatial beam lattice model. (2) Measures such as setting upper beam in the tower, setting stay cable transverse eccentricity in the tower and setting vertical prestressed tendon at the lower part of the tower are adopted to effectively solve the problem of tower transverse stress condition under stay cable radial force. (3) This bridge adopts the sixth generation cable saddle, which realizes two-way anti-sliding through one-sided bidirectional frictional anchorage device, whose frictional force is much clearer and more convenient for construction. (4) 1.4 m and 1.0 m eccentricities to the inner side of the curve are respectively set for spherical hinge and rotary table, ensuring the structural balance during rotation and improving the stress condition of foundation. (5) The research results have reference significance for similar bridges design in the future.
左家强. 铁路小半径曲线转体施工矮塔斜拉桥设计研究[J]. 铁道工程学报, 2022, 39(2): 62-67.
ZUO Jiaqiang. Research on the Design of Extradosed Bridge Using Swivel Construction Method on Small Radius Curve. Journal of Railway Engineering Society, 2022, 39(2): 62-67.
董丽娜.满堂支架法在矮塔斜拉桥施工中的应用[J].交通标准化,2011(15):144-147.Dong Lina.Application of Full Framing Method in Low-pylon Cable-stayed Bridge Construction[J].Transport Standardization,2011(15):144-147.
[2]
王立荣.矮塔斜拉桥设计要点研究[J].交通标准化,2010(2):116-118.Wang Lirong.Study of Low Tower Cable-stayed Bridge Design Features[J].Transport Standardization,2010(2):116-118.
[3]
李青山.矮塔斜拉桥结构特征参数研究[J].交通标准化,2012(4):132-135.Li Qingshan.Structural Characteristic Parameters of Low-pylon Cable-stayed Bridge[J].Transport Standardization,2012(4):132-135.
[4]
叶认秋.矮塔斜拉桥的结构特点和工程质量控制研究[J].交通标准化,2012(15):48-51.Ye Renqiu.Structure Features and Engineering Quality Control of Low-pylon Cable-stayed Bridge[J].Transport Standardization,2012(15):48-51.
[5]
李晓莉.矮塔斜拉桥的力学行为分析与设计实践[J].结构工程师,2005(4):7-10.Li Xiaoli. Mechanical Behavior Analysis and Design Experience of Low-pylon Cable-stayed Bridge[J].Structural Engineers,2005(4):7-10.
[6]
何新平.矮塔斜拉桥的设计[J].公路交通科技,2004(4):66-69.He Xinping. Design of Low Tower Cable-stayed Bridge[J].Journal of Highway and Transportation Research and Development,2004(4):66-69.
[7]
郑建中.斜拉桥斜置鞍座式索塔锚固系统设计[J].结构工程师,2014(3):19-24.Zheng Jianzhong. Design of the Oblique Saddle Type Pylon Anchorage System for Cable Stayed Bridges[J]. Structural Engineers,2014(3):19-24.
[8]
王东.海青铁路跨胶济客运专线(40+64+40)m连续梁转体施工设计[J].铁道标准设计,2014(5):81-85.Wang Dong.Design for Swing-Method Construction of (40+64+40)m Continuous Girder of Haitian-Qingdao Railway across Existing Qingdao-Jinan Railway Passenger Dedicated Line[J].Railway Standard Design,2014(5):81-85.
[9]
井江永.(50+85+50)m跨铁路连续梁不对称转体设计研究[J].铁道标准设计,2018(9):67-71.Jing Jiangyong. Research on Asymmetric Swivel Design of (50+85+50)m Continuous Beam Crossing Existing Railway[J].Railway Standard Design,2018(9):67-71.
[10]
刘文会.矮塔斜拉桥塔高优化分析[J].公路交通科技,2009(10):82-86.Liu Wenhui. Analysis of Pylon Height Optimization for Dwarf Pylon Cable-stayed Bridge[J].Journal of Highway and Transportation Research and Development,2009(10):82-86.