Research on the Present Situation and Improvement Method for Precise Adjustment of Railway Tracks
WANG Xiaokai1, CAI Degou2, WANG Peng1
1. Beijing Tieke Special Engineering Technological Development Corporation, Beijing 100081, China; 2. Railway Engineering Research Instiute, China Academy of Railway Sciences Corporation Limited, Beijing 100081, China
Abstract:Research purposes: It's difficult to effectively improve the amplitude of medium and long waves and control multi-wave irregularities with the existing track precision measurement and fine adjustment methods. Based on the current situation of railway precise adjustment in China and the variation characteristics of track irregularities, by analyzing the principle and improvement method of orbit detection, this paper studied on an improved operation method of track detection and fine adjustment based on the vertical deviation, in order to achieve the purpose of comprehensively improving the smoothness of railway works track fine adjustment. Research conclusions: (1) The detection method based on the vertical deviation method can effectively reduce the amplitude of the long-wave irregularity in the track, and reasonably arrange the operation procedures, which can further improve short-wave amplitude and continuous track irregularities, and improve the track smoothness as a whole on the premise of orbit orientation/height optimization and improvement. (2) In the section of poor track condition and easing curve, the vertical deviation error measured by the inspecting instrument for railway track will be too large. (3) The customized adjustment of railway tracks based on the sensitive wavelength of the vehicle body can further improve the stability of the operation dynamic effect.
王晓凯, 蔡德钩, 王鹏. 铁路工程轨道精调现状及改进方法研究[J]. 铁道工程学报, 2022, 39(11): 33-37.
WANG Xiaokai, CAI Degou, WANG Peng. Research on the Present Situation and Improvement Method for Precise Adjustment of Railway Tracks. Journal of Railway Engineering Society, 2022, 39(11): 33-37.
谭社会.高速铁路无砟轨道精调质量控制技术研究[J]. 铁道标准设计,2015(12):18-22.Tan Shehui. Quality Control Technologies in Fine Adjustment of High-Speed Railway Ballastless Track[J]. Railway Standard Design,2015(12):18-22.
[2]
罗林,张格明,吴旺青,等.轮轨系统轨道平顺状态的控制[M]. 北京:中国铁道出版社,2006:2-8.Luo Lin,Zhang Geming,Wu Wangqing,etc. Control of Track Smoothness in Wheel-Rail System[M]. Beijing:China Railway Publishing House,2006:2-8.
[3]
罗林.高速铁路轨道必须具有高平顺性[J]. 中国铁路,2000(10):8-11.Luo Lin.High Smoothness,a Must for the High-speed Railway Track[J]. Chinese Railways,2000(10):8-11.
[4]
耿立雄,陈宪麦.轨道平顺性综合分析系统的研究[J]. 企业技术开发,2010(1):50-54.Geng Lixiong,Chen Xianmai.Study on Synthetic Analysis System for Track Irregularity[M]. Technological Development of Enterprise,2010(1):50-54.
[5]
高建敏,翟婉明,王开云.高速行车条件下轨道几何不平顺敏感波长研究[J]. 铁道学报,2012(7):83-88.Gao Jianmin,Zhai Wanming,Wang Kaiyun. Study on Sensitive Wavelengths of Track Irregularities in High-speed Operation[J]. Jounal of the China Railway Society,2012(7):83-88.
[6]
TB 10601—2009,高速铁路工程测量规范[S]. TB 10601—2009,Specifications for Survey Engineering of High Speed Railway[S].
[7]
王晓凯.高速铁路精密工程测量问题研究[J]. 铁道勘察,2018(5):29-31.Wang Xiaokai. Research on Problems of Precision Engineering Survey in High-speed Railway[J]. Railway Investigation and Surveying,2018(5):29-31.