Research on the Calculation Method of Tunnel Fault Resistant Based on Energy Release
YUAN Jinxiu1, WANG Daoyuan1, CUI Guangyao2, TIAN Xiaolu3, YANG Yanling3, YANG Jie4, ZHANG Haotian1
1. Hebei Jiaotong Vocational and Technical College, Shijiazhuang, Hebei 050091, China; 2. North China University of Technology, Beijing 100144, China; 3. China Railway 16th Bureau Group Fourth Engineering Co. Ltd, Tianjin 101400, China; 4. Hebei Construction Group Co. Ltd, Baoding,Hebei 572000,China
Abstract:Research purposes: Aiming at the stability of tunnel structure in the process of fault dislocation in high intensity area, the design and calculation method of anti-dislocation is discussed from the perspective of energy release and dissipation. Firstly, the strain energy that can be released when the surrounding rock reaches stability is calculated according to the maximum dislocation momentum; Secondly, the absorbed strain energy of lining structure and surrounding rock is determined according to the load deflection curve of material and the unit strain energy within the plastic zone; Finally, the stability of "surrounding rock-tunnel" system is determined under the given safety condition. Research conclusions: (1) Based on the principle of energy release and dissipation, the calculation formula of the releasable strain energy during the dislocation of the tunnel with stick slip fault is deduced, and the calculation method of the anti-dislocation design of the tunnel lining structure based on the releasable strain energy is established, which can be used in the anti-dislocation design of the tunnel. (2) The results of the anti-dislocation design and calculation method of tunnel lining structure based on releasable strain energy are more than 17% higher than the standard safety, which is safer. (3) "SBFRC+staggered joint reduction+damping layer+expanded arch foot of initial support+thickening of secondary lining arch foot" can be used as the anti-dislocation implementation scheme of actual tunnel crossing fault section.
袁金秀, 王道远, 崔光耀, 田小路, 杨彦岭, 杨杰, 章浩天. 基于能量释放的隧道抗错结构计算方法研究[J]. 铁道工程学报, 2022, 39(11): 70-74.
YUAN Jinxiu, WANG Daoyuan, CUI Guangyao, TIAN Xiaolu, YANG Yanling, YANG Jie, ZHANG Haotian. Research on the Calculation Method of Tunnel Fault Resistant Based on Energy Release. Journal of Railway Engineering Society, 2022, 39(11): 70-74.
Wang D. Y.,Yuan J. X.,Cui G. Y.,etc. Experimental Study on Characteristics of Seismic Damage and Damping Technology of Absorbing Joint of Tunnel Crossing Interface of Soft and Hard Rock[J]. Shock and Vibration,2020(7):1-13.
[2]
Wang Z Z,Zhang Z.Seismic Damage Classification and Risk Assessment of Mountain Tunnels with a Validation for the 2008 Wenchuan Earthquake[J]. Soil Dynamics and Earthquake Engineering,2013,45:45-55.
[3]
王道远,李粮余,袁金秀,等. 逆断层黏滑错动下隧道抗错断力学机制研究[J]. 铁道工程学报,2019(6):62-66.Wang Daoyuan,Li Liangyu,Yuan Jinxiu,etc. Research on the Mechanical Response of Dislocation Fracture of Tunnel under Stick-slip of Reverse Fault[J]. Journal of Railway Engineering Society,2019(6):62-66.
[4]
王道远,袁金秀,王记平,等. 穿越断裂黏滑带隧道合理抗错断设防长度研究[J]. 铁道工程学报,2019(3):56-60.Wang Daoyuan,Yuan Jinxiu,Wang Jiping,etc. Research on the Fortification Length of Anti-breaking of Tunnel Passing through Fault Slip Belt[J]. Journal of Railway Engineering Society,2019(3):56-60.
[5]
耿萍,何悦,何川,等. 穿越断层破碎带隧道合理抗震设防长度研究[J]. 岩石力学与工程学报,2014(2):358-365.Geng Ping,He Yue,He Chuan,etc. Research on Reasonable Aseismic Fortified Length for Tunnel through Fault Fracture Zone[J]. Chinese Journal of Rock Mechanics and Engineering,2014(2):358-365.
[6]
王道远,崔光耀,袁金秀,等. 强震区隧道施工塌方段震害机理及处治技术研究[J]. 岩土工程学报,2018(2):1-7.Wang Daoyuan,Cui Guangyao,Yuan Jinxiu,etc. Seismic Damage Mechanism and Treatment Technologies of Construction Landslide Section of Highway Tunnels in Highly Seismic Region[J]. Chinese Journal of Geotechnical Engineering,2018(2):1-7.
[7]
王道远,崔光耀,袁金秀,等. 断裂黏滑错动下隧道减错措施作用效果模型试验研究[J]. 岩土工程学报,2018(8):1515-1521.Wang Daoyuan,Cui Guangyao,Yuan Jinxiu,etc. Model Tests on Effect of Dislocation Reducing Measures of Stick-slip Fault of Tunnels[J]. Chinese Journal of Geotechnical Engineering,2018(8):1515-1521.
[8]
崔光耀,左奎现,朱长安,等.隧道纤维混凝土二衬承载机理及受力计算方法研究[J]. 土木工程学报,2018(10):122-128.Cui Guangyao,Zuo Kuixian,Zhu Chang′an,etc.Study on Bearing Mechanism and Stress Calculation Method of Tunnel Secondary Lining of Fiber Reinforced Concrete[J]. China Civil Engineering Journal,2018(10):122-128.