Abstract:Research purposes: For the construction of concrete cast-in-place pile of railway bridge and culvert, because of the collapse of local critical soft soil layer and the inaccurate prediction of the factors affecting the construction quality, the construction quality of part of cast-in-place pile is not up to standard, and the waste of rework treatment is serious, effective preventive measures must be taken to ensure the construction quality of cast-in-place pile, and ten key points of effective methods are put forward and studied. Research conclusions:(1) The ten key points include: the entry of raw materials should be regulated; the mixture ratio should be tested; concrete pouring is necessary to control the slump; the soft ground should be based on the control of pile expanding; the location of pipe should be based on the control of buried depth; the sediment thickness should be controlled at the bottom of the pile; the concrete continuity should be controlled in the pile; the compressive strength should be controlled at the top of the pile; the integrity test is based on optimal treatment; the whole process is based on the coordination. (2) The implementation of the ten key points makes the cast-in-place piles all up to the standard and avoids the rework waste. (3) The research results can provide reference for improving the construction quality of the cast-in-place concrete pile in the fields of railway and highway.
常聚友, 刘德伟, 钟在行, 常耀心, 蒿玉顺, 候龙, 马航. 混凝土灌注桩施工质量的心法十要研究[J]. 铁道工程学报, 2023, 40(1): 42-46.
CHANG Juyou, LIU Dewei, ZHONG Zaihang, CHANG Yaoxi, HAO Yushun, HOU Long, MA Hang. Research on the Ten Key Points of Construction Quality of Concrete Cast-in-place Pile. Journal of Railway Engineering Society, 2023, 40(1): 42-46.
TB/T 3275—2018,铁路混凝土[S].TB/T 3275—2018,Concrete for Railway Construction[S].
[2]
JGJ 55—2011,普通混凝土配合比设计规程[S].JGJ 55—2011,Specification for Mix Proportion Design of Ordinary Concrete[S].
[3]
Q/CR 9212—2015,铁路桥梁钻孔桩施工技术规程[S].Q/CR 9212—2015,Technical Specification for Bored Pile Works of Railway Bridge Constructon[S].
[4]
TB 10218—2019,铁路基桩检测技术规程[S].TB 10218—2019, Technical Code for Testing of Foundation Piles of Railway Engineering[S].
[5]
常聚友,谭屹,赵永浩,等.地下水活动对灌注桩完整性的影响研究[J].铁道工程学报,2021(4):33-37.Chang Juyou,Tan Yi,Zhao Yonghao,etc.Research on the Influence of Groundwater Activity on the Integrity of Cast-in-place Piles [J].Journal of Railway Engineering Society,2021(4):33-37.