Abstract:Research purposes:Yicheng Hanjiang River Bridge is a key control project of the newly-built Xiangyang-Jingmen High-speed Railway. The main bridge uses double main spans of 2×200 m to cross the navigable waters of the Hanjiang River. After studying the bridge span layout and support system, the two bridge schemes, cable-stayed stiffened rigid frame continuous beam bridge and steel-concrete composite (hybrid) rigid frame continuous beam bridge, are comprehensively compared from the aspects of technology and economy. Research conclusions:(1) The two schemes are applicable. The cable-stayed stiffening rigid frame continuous beam bridge scheme has advantages in stiffness condition, long-term geometry stability, technical maturity, engineering practice experience, maintenance and landscape effect, etc. (2) The cable-stayed stiffened rigid frame continuous beam bridge scheme, by adopting the layout of "high middle pylon, low side pylon", ensure the reasonable structural stress and avoid the negative reaction of side bearings. (3) The static calculation of the structure shows that the structure is safe and reasonable for loading. The safety of train operation and the comfort of passengers all meet the requirements. (4) The design results can provide reference for similar railway bridges.
李卫东. 宜城汉江铁路特大桥主桥方案设计研究[J]. 铁道工程学报, 2023, 40(2): 41-46.
LI Weidong. Scheme Design and Research of the Main Bridge of Yicheng Hanjiang River Railway Bridge. Journal of Railway Engineering Society, 2023, 40(2): 41-46.
周孝文,陈良江,王新国,等. 高速铁路200~450 m跨度混凝土桥设计关键技术研究总报告[R]. 北京:中国铁路经济规划研究院,2017:4-12,86-106.Zhou Xiaowen, Chen Liangjiang, Wang Xinguo, etc. General Report on the Study of Key Technologies for the Design of 200~450 m Span Concrete Bridges for High-speed Railroads [R]. Beijing: China Railway Economic and Planning Research Institute, 2017:4-12, 86-106.
[4]
宋子威,杨利卫,王德志. 福平铁路乌龙江(144+288+144)m部分斜拉桥主桥设计[J]. 铁道标准设计,2017(11):42-46.Song Ziwei, Yang Liwei, Wang Dezhi. The Design of Main Bridge of Wulong River on Fuzhou-Pingtan Railway[J]. Railway Standard Design, 2017(11):42-46.
[5]
林骋. 常益长铁路沅江特大桥(34+118+240+118+34)m矮塔斜拉桥设计[J]. 铁道标准设计,2020(9):70-74.Lin Cheng. Design of (34+118+240+118+34)m Extradosed Cable-stayed Bridge on Changde-Yiyang-Changsha Railway[J]. Railway Standard Design, 2020(9):70-74.