Abstract:Research purposes: FIDIC Contract Conditions enjoy high reputation in the global engineering contract form for their relative justice and fairness. Meanwhile, FIDIC Contract Conditions are widely used in international engineering field for their strict conditions, strong operability and clear risk liability. This paper mainly introduced the application of FIDIC Conditions of Contract for Plant and Design-Build(Yellow Book) in the DB bidding of the SLH Railway Project. By comparative analysis of time of completion, quality control and investment control between FIDIC Yellow Book and the Bidding Documents of Government Procurement of Infrastructure of the host country, this paper conducted in-depth discussion for practice and strategy of localized application of FIDIC Yellow Book. Research conclusions: (1) The key point of localized application of FIDIC Contract Conditions is to adapt the unique construction supervision & legislation environment in the host country. (2) Particular contract conditions are particularly important and should match to the characteristics of the project. (3) The research results can provide reference for the negotiation and signing of contract conditions for international DB bidding.
朱欣. FIDIC在海外DB招标中的属地化应用实践与思考[J]. 铁道工程学报, 2023, 40(6): 104-104.
ZHU Xin. Practice and Observation of Localized Application of FIDIC Contract Conditions in Design-build Bidding of International Project. Journal of Railway Engineering Society, 2023, 40(6): 104-104.