Abstract:Research purposes: Due to the complexity, sequence, space and openness of investment consumption factors in subway construction projects, the existing fixed investment control mode has far failed to meet the requirements of investment randomness and nonlinear evolution, and it is urgent to reform the subway investment control management mode. Therefore, this paper comprehensively uses BIM, Python technology, fuzzy mathematics, BP neural network, acquired value theory and PDCA cycle method to build an intelligent prediction and control method for subway construction investment. Research conclusions: (1) The basic database of subway construction investment is established, and the cause and countermeasure database of subway project investment is constructed. (2) Using SPSS factor analysis, rough set theory, fuzzy mathematics combined with BP neural network, the overall construction objective of the whole line is obtained. (3) Integrated PDCA cycle and acquired value theory carry out dynamic investment optimization control for key control projects, significantly improving the overall management efficiency and level of the project. (4) The computer aided intelligent control software for subway construction investment was established and applied in Chengdu subway construction example. (5) The research results can provide a feasible plan for the investment control of the entire subway line construction.
段晓晨, 杨静, 汪辉, 王丹. 基于大数据的地铁全线建设投资智能控制研究[J]. 铁道工程学报, 2024, 41(11): 118-123.
DUAN Xiaochen, YANG Jing, WANG Hui, WANG Dan. Research on Intelligent Control of Subway Construction Investment Based on Big Data. Journal of Railway Engineering Society, 2024, 41(11): 118-123.
段晓晨,孟春成,施振东,等.地铁车站建设投资智能预测与控制方法研究[J].铁道工程学报,2021(9):106-111.Duan Xiaochen, Meng Chuncheng, Shi Zhendong, etc. Research on the Intelligent Forecast and Control Method of Metro Station Construction Investment[J]. Journal of Railway Engineering Society,2021(9):106-111.
[2]
段晓晨,赵辰光,李明,等.地铁区间盾构施工进度与投资智能控制方法研究[J].铁道工程学报,2023(1):109-115.Duan Xiaochen, Zhao Chenguang, Li Ming, etc. Research on the Intelligent Control Method of Subway Shield Construction Schedule and Investment[J]. Journal of Railway Engineering Society,2023(1):109-115.
[3]
陈晓娟. 地铁车站建设进度及投资控制研究[J].交通科技与管理,2023(20):66-68.Chen Xiaojuan.Research on Subway Station Construction Schedule and Investment Control[J]. Transportation Science and Management,2023(20):66-68.
[4]
景真燕. 基于BIM技术的地铁工程项目投资控制[J].中国高新科技,2022(7):114-115.Jing Zhenyan.Investment Control of Subway Project Based on BIM Technology[J]. China High-Tech,2022(7):114-115.
[5]
段晓晨,张文,喇海霞,等.地铁盾构掘进进度三维非线性控制方法研究[J].铁道工程学报,2020(5):93-98.Duan Xiaochen, Zhang Wen, La Haixia, etc. Research on the Three Dimensional Nonlinear Control Method of Metro Shield Tunneling Progress[J]. Journal of Railway Engineering Society, 2019(5):93-98.
[6]
段晓晨,孟春成,吴曼茜,等.地铁车站土建工程施工进度三维动态优化控制[J].地下空间与工程学报,2022(5):1678-1688.Duan Xiaochen, Meng Chuncheng, Wu Manqian, etc. 3D Dynamic Optimal Control of Civil Engineering Construction Schedule of Metro Station[J]. Chinese Journal of Underground Space and Engineering,2022(5):1678-1688.